Laserfiche WebLink
GEI Consultants | City of Sunny Isles Beach | RFQ 26-07-01 122 <br />GUIDO VAN MEEK, PE <br />Civil Engineering Director <br />EDUCATION <br />•MS Civil Engineering, 1966 <br />University of Maryland, College <br />Park, Maryland <br />•BS Civil Engineering 1962 <br />Universidad Nacional de <br />Colombia, Bogotá Colombia <br />S.A. <br />PROFESSIONAL REGISTRATION <br />•Professional Engineer (P.E. <br />Florida License No. 17382) <br />•Professional Engineer (P.E. <br />Colombia License No. 5286) <br />PROFESSIONAL AFFILIATIONS <br />•Florida Engineering Society, <br />(FES) Miami Chapter. <br />•National Society of Civil <br />Engineers <br />•American Society of Civil <br />Engineers <br />•Water Pollution Control <br />Federation <br />•American Water works <br />Association <br />•The Marine Council <br />Interamerican Businessman <br />Association <br />FIELD OF SPECIALIZATION <br />•Civil Engineering Design <br />•Construction Management <br />YEARS OF EXPERIENCE <br />50+Years <br />EXPERIENCE SUMMARY <br />Mr. Van Meek is a Senior Civil Engineer at Conemco Consultants, <br />where he oversees the planning and development of designs within the <br />Civil Engineering Department for both public and private sector <br />projects. With decades of experience, his expertise spans roadways, <br />water transmission and distribution, as well as sanitary sewer collection, <br />treatment, and disposal. In addition, Mr. Van Meek plays a key role in <br />project management, design, construction supervision, and conducting <br />feasibility assessments. <br />RELEVANT EXPERIENCE <br />Miami-Dade Water and Sewer Department (WASD) <br />Infiltration/Exfiltration/Inflow (I/E/l) Reduction Program <br />Engineering and construction management to reduce more than 60 <br />mgd of I/E/I within 5 years at an estimated cost to the county, of $100 <br />M. Work includes work scheduling, permitting process, construction <br />management, coordination with utility companies as well as federal, <br />state and local regulatory agencies. <br />Compartment ‘C’ Build Out G-508 Station, South Florida Water <br />Management District (SFWM) (Hendry County, FL) <br />Mr. Var Meek, as the Senior Engineer, supervised South Florida Water <br />Management District, Storm Water Treatment Area (STA) on <br />Compartment C land to assist the existing STA’s in improving the quality <br />of water entering the Everglades Protection Area. This project enables <br />the district to achieve Everglades water quality standards as part of the <br />implementation of the long-term plan to ensure that all water <br />discharging into the Everglades protection area complies with State <br />water quality standards. Involved in the process from quantity take-off, <br />pricing, bidding, and final submittal. Responsible for: scheduling, <br />monitoring, and supervising the material testing of the project. <br />F.E.M.A. Drainage Project - Miami-Dade County (Miami, FL) <br />As Senior Engineer, Mr. Van Meek led the design of a new storm <br />drainage system design, to alleviate the spread flooding experienced <br />during the most recent (Irene and No-Name) storms that affected the <br />County. Work includes water management analysis of the existing <br />conditions, new design, coordination with other consultants including <br />surveyors, utility coordination and construction coordination, and cost <br />estimates. <br />Camp Matecumbe Playground (Miami, FL) <br />As the Senior Engineer, Mr. Van Meek provided construction <br />management services and oversaw the preparation of complete civil <br />drawings and calculations. His responsibilities included paving and <br />drainage plans, parking lot profiles, traffic coordination, traffic signage <br />and markings for the parking area and entry drive to support the <br />property's permitting process. <br />AAFERN New Office Building (Miami, FL) <br />Mr. Van Meek assisted the Senior Engineer in the preparation of a <br />complete set of structural and civil plans for the construction of a 24,000 <br />sq. ft. office building and metal warehouse used for the maintenance <br />and repair of large trucks. He also participated in the design of a <br />concrete slab parking lot, including paving and drainage designs and <br />traffic signage.