Laserfiche WebLink
GEI Consultants | City of Sunny Isles Beach | RFQ 26-07-01 127 <br />ALEJANDRO ESTEVEZ, PE <br />127 <br />Mt. Sinai Hospital (Miami Beach, FL) <br />Mr. Estevez led an imminent power quality investigation with a team of specialized individuals, such <br />as chief electricians, control center dispatchers, dedicated switchmen, account manager, among <br />others, to quickly understand the cause of voltage sags that were occurring at the hospital. Being <br />such a delicate case, the investigation was done overnight to minimize impact, and a resolution was <br />swiftly implemented to avoid any unprecedented equipment failure conditions. <br />Flagler Global Logistics Countyline (Hialeah, FL) <br />Mr. Estevez was in charge of all electrical infrastructure discussions to a corporate park that included <br />8 load-heavy commercial warehouses on Phase 1 of a multi-year plan. Discussions and coordination <br />were needed in order to add a substation in the area. Initial electrical load for Phase 1 surpassed <br />13,000KVA and 50,000KVA were projected within 10 years. The construction site, located north of <br />NW 154th St and east of NW 107th Ave, has a total area of over 20,000,000 Sq.Ft. <br />Aventura Mall Outage (Aventura, FL) <br />Mr. Estevez, during a tenure on the field operation side, responded to a high-profile outage directing <br />a team of union employees to respond and immediately repair equipment failure. SCADA logs and <br />record engineering drawings were carefully analyzed to understand the risk points and provide <br />redundancy recommendations for future instances. As the responding supervisor, Mr. Estevez for <br />quick response plan of action. All affected stakeholders were maintained updated, including media, <br />during the event. <br />Hardrock Stadium Operations (Miami Gardens, FL) <br />Mr. Estevez was appointed operations point of contact between the engineering department at Hard <br />Rock Stadium and electrical utility. Over the course of 3 years with events such as NFL/ NCAA <br />televised games (including the 2020 Superbowl), Miami Tennis Open, and the highly anticipated debut <br />of F1 in 2022, Mr. Estevez assumed role to always coordinate electrical certainty. Constant <br />deliberations prior to these events with follow-up recommendations resulted in reliable electrical <br />service. With millions of dollars in revenue at stake,electrical certainty is overshadowed but extremely <br />important. In 2013 there was a blackout in Mercedes-Benz Superdome, in New Orleans, during the <br />2013 Superbowl for 34 minutes that caused rippling effects to the industry. Prestigious televised events <br />have a large audience and Mr. Estevez,and his team valued the responsibility given during his tenure <br />as direct point of contact. Communication, technical deliberation, and timely decisions are a pillar to <br />the role and were clearly demonstrated.