Laserfiche WebLink
GEI Consultants | City of Sunny Isles Beach | RFQ 26-07-01 126 <br />ALEJANDRO ESTEVEZ, PE <br />Electrical Engineering Director <br />EDUCATION <br />•Master of Science in <br />Engineering Management, <br />Florida International University, <br />Miami, FL, 2017 <br />•Bachelor of Science in Electrical <br />Engineering, Florida <br />International University, Miami, <br />FL, 2014 <br />•Bachelor of Science in <br />Computer Engineering, Florida <br />International University, Miami, <br />FL, 2014 <br />PROFESSIONAL REGISTRATION <br />•Professional Engineer Florida <br />P.E. # 97203 <br />CERTIFICATIONS <br />•Six Sigma Green Belt (CSSGB) <br />•OSHA 30-Hour <br />•Prosci Change Management <br />(POPM) <br />FIELD OF SPECIALIZATION <br />•Electrical Design <br />•Electrical PQ Testing <br />•Project Management <br />•Aigile System Product Owner <br />YEARS OF EXPERIENCE <br />10+Years <br />EXPERIENCE SUMMARY <br />With over a decade of experience in engineering, consulting, and <br />energy operations, Mr. Estevez has built expertise in project <br />management, systems integration, and technical analysis. His <br />background includes leading agile teams to implement enterprise-wide <br />digital platforms, performing advanced engineering calculations for <br />large-scale projects, and directing field operations across multiple <br />regions. He has supervised union workforces, overseen power quality <br />testing at various system levels, and delivered consulting services that <br />improve organizational efficiency and performance. Combining <br />leadership and technical acumen, he provides effective solutions that <br />enhance reliability, streamline processes, and support long-term growth <br />in both private and public sectors. <br />RELEVANT EXPERIENCE <br />Alexander Orr Water Treatment (Miami, FL) <br />Mr. Estevez led a team that performed a transient analysis to the South <br />Florida plant by installing recorders to capture the transient occurrences <br />that were reported. The intricate findings, which lasted several weeks, <br />was resolved after several conversations led by Mr. Estevez, that traced <br />the faults coming from two feeders in the same bus at the utility <br />substation. <br />WASD Pump Stations Upgrades (Miami, FL) <br />Mr. Estevez was direct point of contact for a WASD pump station <br />electrical upgrades of over 20 stations in Miami. The upgrade design <br />requirements spanned from specific voltage requests, phasing upgrade, <br />relocations among other. Each unique project presented challenges <br />from the governing municipalities, required coordination with other <br />utilities, and sometimes redundancy power for disruptions and <br />scheduled outages. <br />Miami Lakes Town Center (Miami Lakes, FL) <br />Mr. Estevez oversaw a multi-phase project in Main St, Miami Lakes, in <br />conjunction with The Graham Companies, that was divided into 4 <br />separate folios, spread over 1,000,000 Sq.Ft, and accounted for 8 total <br />buildings inclusive of retail, office, and residential buildings. The <br />timeline, strict ordinances, and construction environment created <br />complex project management conditions that were successfully <br />overcame with clear communication and prompt decision making. <br />Transbay Power Load Study (Pittsburg, CA) <br />Mr. Estevez conducted a power quality analysis at a DC plant with the <br />assistance of several qualified plant technicians. CT monitoring devices <br />were placed at a pre-determined location for an extended period of time <br />to monitor harmonic distortion, which was further analyzed on a power <br />monitoring software to provide graphical findings and <br />recommendations. <br />Blue Lagoon Residences (Miami, FL) <br />Mr. Estevez was lead engineer in charge of designing and managing <br />full electrical implementation to project that included two 8-story <br />buildings, one 2-story club house, and two 3-story garages. This <br />multifamily project was over 400,000 Sq. Ft, has over 270 living units, <br />and required over 2000KVA.