My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GEI Consultants, Inc. Bid Document (11)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
GEI Consultants, Inc
>
GEI Consultants, Inc. Bid Document (11)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 1:25:17 PM
Creation date
8/31/2026 1:23:38 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GEI Consultants | City of Sunny Isles Beach | RFQ 26-07-01 5151 <br />The Town Dock is a public recreation facility located in Port Washington, NY <br />along the eastern shoreline of Manhasset Bay. The site provides public access <br />for parking while serving as a popular location for fishing and tourism. The <br />structure also supports multiple floating dock platforms for use as kayak <br />launches, tour boat mooring, and harbor police boats. <br />In Summer 2015, GEI’s waterfront engineers (formerly of Rising Tide Waterfront Solutions) were <br />invited by the Town of North Hempstead to perform a comprehensive evaluation of the facility’s <br />condition and develop recommendations for structural rehabilitation and maintenance in <br />response to damages sustained during Superstorm Sandy. This initial scope of work comprised <br />of an above and below water inspection of the facility, a Phase 1 environmental site assessment, <br />review of existing bathymetric survey data, and soil borings with a full geotechnical report. <br />Through committed eff orts and careful coordination with Town off icials, GEI staff completed <br />these services before the year’s end. <br />Acknowledging the value of the detailed reports regarding the damages that the structure <br />sustained during Superstorm Sandy, the Town retained GEI’s staff to further assist with <br />application for FEMA grant funding, and FEMA obligated funding for the in-kind replacement <br />of Town Dock. In 2019, Rising Tide was short-listed as a preferred firm to lead the FEMA-funded <br />replacement design eff ort and was ultimately awarded work as a subconsultant to the prime <br />consultant to manage the waterfront-specific aspects of the design. Since joining GEI, the same <br />staff have engaged as the Agent to the Town of North Hempstead requesting authorization from <br />federal and state regulatory agencies for the replacement of the steel sheet pile bulkhead and <br />will continue to serve as the design team’s representative throughout the construction process. <br />GEI is currently serving the Town as a waterfront subconsultant responsible for the permitting <br />and design necessary to reconstruct the bulkhead along with redesigning the dock space north <br />of the dock and nourishing the southern coastal stone protection. We anticipate the project to <br />enter contractor solicitation and construction in 2026. <br />Key challenges have included: <br />• Comprehensive reporting <br />with repair recommendations, <br />FEMA CEF presentation, and <br />funding solicitation <br />• Geotechnical, Topographic, <br />and Ground Penetrating <br />Radar (GPR) studies <br />• Assessment of the Cathodic <br />Protection System, where <br />present, with location provided <br />through drone study <br />DATES <br />2015-Ongoing <br />Initial evaluation and <br />reporting began in 2015. <br />FEMA grant funding and <br />design phases have been <br />ongoing since 2019. <br />Construction is anticipated <br />to begin in 2026. <br />The project is progressing <br />according to the anticipated <br />schedule, with GEI providing <br />comprehensive engineering <br />and permitting services <br />to support a seamless <br />transition to construction <br />FEES <br />Estimated $19.6M <br />construction budget. The <br />project is currently in the bid <br />phase; actual construction <br />costs are not yet available. <br />CLIENT REFERENCE <br />ROBERT FAZIO <br />Deputy Commissioner of <br />Public Works <br />516.739.6710 <br />KEY ELEMENTS <br />• Storm Damage Response <br />• Comprehensive Field <br />Investigation <br />• Permitting and Regulatory <br />Coordination <br />• Coastal Engineering <br />• Steel Sheet Pile Bulkhead <br />Design <br />• Construction Phase <br />Services <br />PROJECT OUTCOMES <br />Innovation: Integrated FEMA-compliant resiliency <br />criteria with constructible seawall and pier designs <br />tailored to public access and community use. <br />Cost Savings: Strategic use of in-kind replacement <br />and phased implementation supported grant <br />compliance while minimizing local capital burden. <br />Risk Reduction: Early condition assessments, hazard <br />mitigation planning, and stakeholder coordination <br />reduced exposure to storm damage and funding risk. <br />Town Dock Bulkhead and Docks <br />Town of North Hempstead | Port Washington, NY
The URL can be used to link to this page
Your browser does not support the video tag.