Eduardo Reyes elements. Eduardo incorporated underground utility data including manholes, invert elevations, pipe materials, and diameters, as well as overhead clearance requirements for transmission line design. He also included tree locations and cross-section elevations at 100-foot intervals, ensuring accurate and comprehensive survey documentation for infrastructure
<br />planning and design. CR-713 / High Meadow Avenue Corridor Survey (FPID: 441699-1-32-01) | Client: FDOT District IV (via Atkins) | Dates: January 2026 – Ongoing | Amount: $146,544.87 As a Senior Survey CADD Technician, Eduardo Reyes is currently supporting this FDOT District IV roadway project by overseeing the preparation of detailed topographic survey base maps for design and engineering analysis. He processes field-collected data to produce accurate existing-conditions drawings that include roadway geometry, drainage systems, utilities, sidewalks, driveways, signage, and pavement markings. Eduardo ensures the integration of horizontal and vertical control data, right-of-way limits, and cross-street tie-ins into CAD deliverables that meet FDOT standards for accuracy and digital compatibility. His work supports roadway design, ADA compliance evaluations, traffic safety improvements, and overall project development, providing the design team with reliable, high-quality survey information. Shoreline Repair – Mini Rapids Park | Client: GHD Services Inc. | Dates: January 2026 – Ongoing | Amount: $32,862.50 As a Senior Survey CADD Technician, Eduardo Reyes is supporting shoreline stabilization efforts along the Miami River by preparing topographic, bathymetric, and SUE-based mapping deliverables. He processes survey data to accurately represent shoreline conditions, riverbed elevations, and adjacent infrastructure for two project segments. Eduardo integrates Quality Level B utility data into base maps to support seawall design and roadway restoration, including guardrails, pavement, and signage improvements. His work plays a critical role in supporting erosion mitigation, infrastructure protection, and long-term resilience planning.
<br />Project: City of Miami Comprehensive Stormwater Master Plan (B-30632A) | Client: City of Miami (via CDM Smith) |
<br />Dates: 01/ 2019 -01/2020]
<br />As a Senior Survey CADD Technician, Eduardo Reyes played a key role in supporting the development of the City’s
<br />Stormwater Master Plan by processing and drafting large-scale survey data. He assisted in establishing a horizontal and
<br />vertical control network across the City and preparing control maps for long-term project use. Eduardo processed GPS
<br />data for hundreds of surveyed features and building finished floor elevations, integrating this information into CAD
<br />deliverables. He also supported seawall surveys, aerial photogrammetry control targeting, and canal cross-section data
<br />collection, ensuring accurate representation of drainage infrastructure and coastal features. His work contributed to
<br />reliable mapping used for drainage analysis, infrastructure evaluation, and long-term planning.
<br />Project: Various Intersections Topographic Survey (Contract E15-PWWM-07, Project 20170037) | Client: Miami-Dade
<br />County | Dates: 07/2019 -10/2019
<br />As a Senior Survey CADD Technician, Eduardo Reyes supported topographic surveys for multiple intersections by
<br />preparing CAD drawings based on field-collected data. He processed survey information to establish Right-of-Way
<br />centerlines, boundary lines, and control baselines using plats and public records. Eduardo incorporated drainage
<br />infrastructure data, including structure sizes, pipe inverts, and elevations, along with cross-section data at 25-foot
<br />intervals. He drafted overhead utilities, mast arms, and clearance information, ensuring complete and accurate
<br />representation of site conditions for roadway design and improvements. Riverside Park | Client: Ferguson Glasgow Schuster Soto Inc. | Dates: September 2021 – October 2021 | Amount: $14,329.00As a Senior Survey CADD Technician, Eduardo Reyes supported the Riverside Park project by preparing boundary and topographic survey drawings based on comprehensive field data collection. He processed survey information to accurately depict property boundaries, easements, and right-of-way limits derived from deeds, plats, and record documents. Eduardo
<br />assisted in drafting detailed planimetric features, including sidewalks, pavements, drainage structures, fences, walls, utilities, and park amenities, along with a dense grid of elevation shots to represent existing grade conditions.He also contributed to the preparation and integration of a complete tree inventory, including species, trunk diameter, height, and canopy spread, ensuring accurate mapping for environmental and permitting requirements. Eduardo incorporated drainage data such as invert elevations, pipe sizes, materials, and flow direction into CAD deliverables, along with overhead utility lines and poles identified within the survey limits. Additionally, he assisted in drafting benchmark control points with State Plane coordinates and NAVD88 elevations for construction reference. His work resulted in precise, high-quality survey base maps supporting design, permitting, and future construction activities.
<br />35
|