My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HADONNE CORP Bid Document (33)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
HADONNE CORP
>
HADONNE CORP Bid Document (33)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 1:26:00 PM
Creation date
8/31/2026 1:25:20 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Upon receipt of each assignment, the Project Manager, Frank Paruas, PSM, will develop a detailed, task-specific schedule that clearly defines project <br />milestones, deliverables, and critical deadlines. Work activities are logically sequenced and aligned with available resources to maximize productivity while <br />maintaining compliance with City requirements. <br />Schedules are actively monitored and updated throughout the project lifecycle to reflect progress, field conditions, and any changes in scope. Mr. Paruas <br />maintains close coordination with field crews, technical staff, and subconsultants to ensure tasks remain on schedule and potential delays are identified <br />early. When necessary, adjustments are <br />implemented promptly to mitigate impacts and <br />maintain overall project performance. <br />HADONNE will develop a comprehensive Project <br />Plan utilizing our in-house Digital Project <br />Management (DPM) based software, which serves <br />as the foundation for managing both project <br />schedule and budget. This structured approach <br />ensures consistency, accountability, and efficient <br />execution across all task work orders. <br />The Project Plan establishes detailed work <br />breakdown structures to clearly define project tasks <br />and deliverables, along with accurate schedules that incorporate logical sequencing and assignment of responsibilities to appropriate staff. In addition, <br />comprehensive cost estimates are prepared to support effective budget management and resource allocation. <br />This process establishes a clear and measurable project baseline, which is continuously monitored throughout the project lifecycle. By tracking performance <br />against this baseline, HADONNE ensures timely identification of variances, proactive adjustments, and successful delivery of projects in accordance with <br />the City requirements. <br />HADONNE maintains flexibility and resources to respond rapidly to City needs, including the ability to mobilize a Survey/SUE field crew within 24 hours of <br />authorization. For projects requiring Quality Level A (QLA) utility verification, HADONNE can coordinate and deploy vacuum excavation services typically <br />within 72 hours following an 811 Sunshine State One-Call ticket response. <br />Regular communication with the City staff ensures transparency regarding schedule status, upcoming activities, and key milestones. Through disciplined <br />scheduling, continuous oversight, and responsive coordination, HADONNE ensures efficient project execution and the consistent, on-time delivery of high- <br />quality surveying and mapping services. <br />43
The URL can be used to link to this page
Your browser does not support the video tag.