Laserfiche WebLink
18IWFLFTLD016838.2026 <br />ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES <br />(CCNA) RFQ # 26-07-01 <br />CONTINUING PROFESSIONAL <br />Our Understanding of Sunny Isles Beach <br />In Sunny Isles Beach, nearly every park, streetscape, and drainage project sits at the intersection of three jurisdictions: <br />City, County, and FDOT, and knowing where one ends and the next begins is essential to keeping work on schedule. <br />Our team navigates this framework every day. <br />The City’s defining feature is its main corridor: Collins Avenue runs the length of the island as State Road A1A, <br />an FDOT District Six facility currently undergoing an active roadway improvement project. Because A1A is state- <br />maintained, almost any work that touches or drains toward Collins Avenue triggers FDOT coordination for utility <br />permits, drainage connections, and maintenance of traffic, and identifying that FDOT involvement up front keeps the <br />permitting timeline on track. <br />Utility ownership here doesn’t follow the typical South Florida pattern. Potable water comes from NMB Water (North <br />Miami Beach), sanitary sewer belongs to Miami-Dade County (WASD), and fire rescue is provided by Miami-Dade <br />County Fire Rescue. Stormwater, however, is owned and maintained by the City itself, making it the direct client and <br />reviewer for the drainage work most park and streetscape projects depend on. <br />The same split shapes permitting. Depending on the project, we’ll work through the City’s Building, Public Works/ <br />Engineering, and Planning & Zoning departments, coordinate with Miami-Dade County RER/DERM, WASD, and NMB <br />Water, bring in SFWMD or FDEP when the scope calls for it, and go through FDOT District Six for anything in the A1A <br />right-of-way. We know these reviewers and the order they need to be brought in, which keeps surprises off the table. <br />Cesar Borges, PE, our Contract Manager, has spent more than a decade working <br />alongside the FDOT District Six Drainage Department and served as Engineer of Record <br />on state-road pump station and drainage designs along A1A corridors, including the S.R. <br />A1A/Harding Avenue and S.R. 907/Alton Road pump stations in Miami Beach. That’s the <br />same agency environment Sunny Isles Beach deals with on its most important corridor. This gives <br />the City the assurance that we know its environment and the agencies it deals with.