My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kimley-Horn and Associates, Inc. Bid Document (9)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
Kimley-Horn and Associates, Inc
>
Kimley-Horn and Associates, Inc. Bid Document (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 1:28:28 PM
Creation date
8/31/2026 1:26:57 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
33IWFLFTLD016838.2026 <br />ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES <br />(CCNA) RFQ # 26-07-01 <br />CONTINUING PROFESSIONAL <br />Saga Bay Drainage Improvements, Cutler Bay, FL <br />The Town of Cutler Bay is experiencing flooding within the Saga Bay neighborhood. Kimley-Horn was retained to <br />prepare and deliver design and construction plans to improve stormwater management and improve stormwater quality <br />within the project limits. The professional services associated with this project include design, permitting, bid document <br />development, bidding assistance, and limited construction phase services. The proposed drainage improvements <br />consist of exfiltration trenches, manholes, catch basins, piping, and roadway and swale restoration. <br />City of Lighthouse Point Stormwater Master Plan and Vulnerability Assessment, <br />Lighthouse Point, FL <br />The City of Lighthouse Point sought to update its stormwater master plan for the first time in more than two decades. <br />Building on a recently developed partnership, the City tasked Kimley-Horn with the preparation of this update to assess <br />the performance of the existing stormwater system and reduce flood hazards. This project considered previously <br />planned and implemented stormwater improvements within the City, and its goals included the delivery of an updated <br />drainage atlas, hydrologic and hydraulic modeling for the existing stormwater systems, and identification of alternatives <br />for improvements to address deficiencies in the system. The study’s analyses considered flood depth and flood time <br />reduction improvements to level of service for each proposed alternative and resulted in a capital improvement plan to <br />provide the framework for implementation. <br />Dates of Service: <br />2021–Ongoing <br />Contact: <br /> H Yenier Vega <br /> Ǚ Assistant Director of Public Works <br /> Ȋ 10720 Caribbean Boulevard, Suite 105, Cutler Bay, FL 33189 <br /> °305.234.4262 <br />Dates of Service: <br />2022–2023 <br />Contact: <br /> H Dewain Akerblom <br /> Ǚ Public Works Director <br /> Ȋ 4730 NE 21st Terrace, Lighthouse Point, FL 33064 <br /> °954.946.7386
The URL can be used to link to this page
Your browser does not support the video tag.