|
| 47RFQ #26-07-01
<br />Jesse Ramon
<br />Senior Survey Technician
<br />investigations, ensuring accurate documentation of existing conditions and underground utilities to support the project’s
<br />design and engineering requirements.
<br />Miami Lakes Park West Bicycle and Pedestrian Improvements Town of Miami Lakes, FL
<br />Jesse Ramon served as Senior Survey Technician, coordinating field operations, survey control, and data collection for the
<br />Town of Miami Lakes Park West Bicycle and Pedestrian Improvements project. He supported the preparation and quality
<br />control of survey deliverables, providing accurate survey data for the design of bicycle lanes, crosswalk enhancements,
<br />speed tables, signage, pavement markings, and ADA-compliant pedestrian improvements that improved safety and
<br />connectivity throughout the Town.
<br />SR 5 US-1 at SW 137th Avenue/SR 5 US-1 at Caribbean Boulevard Intersection Improvements, FDOT District 6,
<br />Miami-Dade County, FM No: 444758-1-52-01
<br />Jesse Ramon served as Senior Survey Technician for this Subsurface Utility Engineering (SUE) project at SR 5 (US-1) and
<br />SW 137th Avenue, and SR 5 (US-1) and Caribbean Boulevard. He supported utility designation activities by assisting with
<br />the collection, analysis, and verification of underground utility information within the project limits. Jesse reviewed field
<br />data, coordinated the processing of utility mapping information, and performed quality control checks to ensure accurate
<br />depiction of existing subsurface utility infrastructure. He also assisted in the preparation of survey and utility deliverables
<br />used to support project planning, design, and utility conflict evaluation in accordance with applicable standards and
<br />project requirements.
<br />Resurfacing Restoration and Rehabilitation (RRR) of the SR 7 / US 441 / NW 8th Avenue / NW 7th Avenue from North
<br />of NW 3rd Street Exception at Miami River Bridge, FDOT District 6, Miami-Dadd County
<br />Jesse Ramon served as Senior Survey Technician for this Subsurface Utility Engineering (SUE) contract, supporting the
<br />planning, coordination, and execution of utility investigation activities. He assisted with the review, processing, and
<br />quality control of utility designation and verification data, ensuring accurate documentation of existing subsurface
<br />utility infrastructure. Jesse coordinated survey and utility information, analyzed field-collected data, and supported the
<br />preparation of utility mapping and project deliverables used for design, construction, and utility conflict analysis. His
<br />responsibilities included verifying data accuracy, maintaining project documentation, and ensuring compliance with
<br />project requirements and industry standards.
<br />CEI Survey Services FDOT District 6, Miami-Dade County, FM: 250676-3-62-01 / Contract No. C-A434
<br />Jesse Ramon served as Senior Survey Technician for this FDOT District 6 continuing services contract, supporting a variety
<br />of construction surveying assignments for transportation infrastructure projects. He assisted with the coordination,
<br />processing, and quality review of survey data associated with the re-establishment of project baselines, control points,
<br />and benchmarks, as well as drainage surveys, bridge data collection, and cross-section development. Jesse supported
<br />field and office survey operations required for construction activities, engineering design surveys, and right-of-way
<br />mapping efforts. His responsibilities included reviewing survey information, verifying data accuracy, assisting with the
<br />preparation of right-of-way control survey documentation and legal descriptions, and ensuring deliverables complied
<br />with FDOT standards and project requirements.
<br />Venetian Causeway - Pedestrian Crossing Improvements W. San Marino Drive and Venetian Way,City of Miami Beach,
<br />Miami Beach, FL
<br />Jesse Ramon served as Assistant Project Surveyor Technician, supporting field and office coordination for the three
<br />intersections. He assisted with right-of-way and boundary research, preparation of topographic mapping, and QA/
<br />QC of survey data. His responsibilities also included supporting control establishment and coordinating elevation data
<br />collection to produce accurate base mapping for design. Longitude Surveyors performed a topographic survey for the
<br />Venetian Causeway Pedestrian Crossing Improvements in Miami Beach, FL, at three intersections. Services included
<br />establishing horizontal and vertical control, right-of-way and boundary depiction, and mapping of existing features such
<br />as pavement, sidewalks, utilities, drainage structures, and site improvements, along with elevation data collection to
<br />support design.
|