Laserfiche WebLink
| 47RFQ #26-07-01 <br />Jesse Ramon <br />Senior Survey Technician <br />investigations, ensuring accurate documentation of existing conditions and underground utilities to support the project’s <br />design and engineering requirements. <br />Miami Lakes Park West Bicycle and Pedestrian Improvements Town of Miami Lakes, FL <br />Jesse Ramon served as Senior Survey Technician, coordinating field operations, survey control, and data collection for the <br />Town of Miami Lakes Park West Bicycle and Pedestrian Improvements project. He supported the preparation and quality <br />control of survey deliverables, providing accurate survey data for the design of bicycle lanes, crosswalk enhancements, <br />speed tables, signage, pavement markings, and ADA-compliant pedestrian improvements that improved safety and <br />connectivity throughout the Town. <br />SR 5 US-1 at SW 137th Avenue/SR 5 US-1 at Caribbean Boulevard Intersection Improvements, FDOT District 6, <br />Miami-Dade County, FM No: 444758-1-52-01 <br />Jesse Ramon served as Senior Survey Technician for this Subsurface Utility Engineering (SUE) project at SR 5 (US-1) and <br />SW 137th Avenue, and SR 5 (US-1) and Caribbean Boulevard. He supported utility designation activities by assisting with <br />the collection, analysis, and verification of underground utility information within the project limits. Jesse reviewed field <br />data, coordinated the processing of utility mapping information, and performed quality control checks to ensure accurate <br />depiction of existing subsurface utility infrastructure. He also assisted in the preparation of survey and utility deliverables <br />used to support project planning, design, and utility conflict evaluation in accordance with applicable standards and <br />project requirements. <br />Resurfacing Restoration and Rehabilitation (RRR) of the SR 7 / US 441 / NW 8th Avenue / NW 7th Avenue from North <br />of NW 3rd Street Exception at Miami River Bridge, FDOT District 6, Miami-Dadd County <br />Jesse Ramon served as Senior Survey Technician for this Subsurface Utility Engineering (SUE) contract, supporting the <br />planning, coordination, and execution of utility investigation activities. He assisted with the review, processing, and <br />quality control of utility designation and verification data, ensuring accurate documentation of existing subsurface <br />utility infrastructure. Jesse coordinated survey and utility information, analyzed field-collected data, and supported the <br />preparation of utility mapping and project deliverables used for design, construction, and utility conflict analysis. His <br />responsibilities included verifying data accuracy, maintaining project documentation, and ensuring compliance with <br />project requirements and industry standards. <br />CEI Survey Services FDOT District 6, Miami-Dade County, FM: 250676-3-62-01 / Contract No. C-A434 <br />Jesse Ramon served as Senior Survey Technician for this FDOT District 6 continuing services contract, supporting a variety <br />of construction surveying assignments for transportation infrastructure projects. He assisted with the coordination, <br />processing, and quality review of survey data associated with the re-establishment of project baselines, control points, <br />and benchmarks, as well as drainage surveys, bridge data collection, and cross-section development. Jesse supported <br />field and office survey operations required for construction activities, engineering design surveys, and right-of-way <br />mapping efforts. His responsibilities included reviewing survey information, verifying data accuracy, assisting with the <br />preparation of right-of-way control survey documentation and legal descriptions, and ensuring deliverables complied <br />with FDOT standards and project requirements. <br />Venetian Causeway - Pedestrian Crossing Improvements W. San Marino Drive and Venetian Way,City of Miami Beach, <br />Miami Beach, FL <br />Jesse Ramon served as Assistant Project Surveyor Technician, supporting field and office coordination for the three <br />intersections. He assisted with right-of-way and boundary research, preparation of topographic mapping, and QA/ <br />QC of survey data. His responsibilities also included supporting control establishment and coordinating elevation data <br />collection to produce accurate base mapping for design. Longitude Surveyors performed a topographic survey for the <br />Venetian Causeway Pedestrian Crossing Improvements in Miami Beach, FL, at three intersections. Services included <br />establishing horizontal and vertical control, right-of-way and boundary depiction, and mapping of existing features such <br />as pavement, sidewalks, utilities, drainage structures, and site improvements, along with elevation data collection to <br />support design.