Laserfiche WebLink
| 48RFQ #26-07-01 <br />Roni Eniste is a Senior Survey Technician with 11 years of experience in the <br />surveying and mapping industry, supporting and managing a wide range of <br />transportation, municipal, commercial, and infrastructure projects for Longitude <br />Surveyors. He oversees projects from planning through final delivery, ensuring <br />schedules, budgets, technical requirements, and client expectations are <br />consistently met. Roni coordinates field crews, office staff, project resources, and <br />client communications while managing the collection, analysis, and processing <br />of survey data to support project objectives. With a strong understanding of <br />surveying methodologies, advanced technologies, field operations, and office <br />production, he ensures efficient coordination across all phases of a project <br />while maintaining the firm’s quality assurance and quality control standards. His <br />technical expertise, leadership, and commitment to delivering accurate, timely <br />results make him a valuable asset to Longitude Surveyors. <br />Bridge Replacement at N. Miami Avenue over Miami River C-7 Canal, Miami- <br />Dade Department of Transportation and Public Works Miami, FL <br />As Assistant Project Manager, Roni Eniste supported the management of <br />Longitude Surveyors’ Bathymetric and Topographic Survey services for the <br />replacement of the bridge spanning the Little River Canal along SW North Miami <br />Avenue between NW 85th Street and NW 86th Street in Miami-Dade County, <br />the City of Miami, and the Village of El Portal. He assisted with project planning, <br />scheduling, field coordination, and client communication while supporting <br />survey teams performing canal soundings, profile surveys, and topographic data <br />collection. Roni also assisted with monitoring project progress, reviewing survey <br />data and deliverables, and helping ensure accurate, timely survey information to <br />support the successful completion of the project. <br />Topographic Survey of Roadways in Golden Isles, City of Hallandale Beach, <br />Hallandale Beach, FL <br />Roni Eniste served as Assistant Project Manager for this project, supporting the <br />management of Longitude Surveyors’ topographic surveying and Subsurface <br />Utility Engineering (SUE) Quality Level B designation services throughout the <br />project corridor. He assisted with project planning, scheduling, field coordination, <br />and client communication while supporting teams performing boundary and <br />right-of-way research, survey control establishment, topographic data collection, <br />and ASCE-compliant SUE investigations using electromagnetic locating and <br />Ground Penetrating Radar. Roni also assisted with coordinating Sunshine 811 <br />utility locates, monitoring project progress, reviewing survey data and Digital <br />Terrain Model deliverables, and helping ensure accurate, timely, and high-quality <br />survey information to support design and utility conflict analysis. <br />City of Hialeah Roadway Improvements, SE 4 Place to SE 7 Place from SE 6 <br />Avenue to SE 8 Avenue <br />Roni Eniste served as Assistant Project Manager for this project, supporting the <br />management of the topographic survey conducted between Southeast 6 Avenue <br />and Southeast 8 Avenue, including Southeast 4, 5, 6, and 7 Places. He assisted <br />with project planning, scheduling, field coordination, and client communication <br />while supporting survey teams performing boundary and right-of-way research, <br />survey control establishment, topographic data collection, and Digital Terrain <br />Model (DTM) development. Roni also assisted with reviewing survey data and <br />Roni Eniste <br />Senior Survey Technician <br />INDUSTRY TENURE <br />11 years <br />LONGITUDE TENURE <br />11 years <br />EDUCATION <br />BS, University of <br />Notre Dame <br />(1997)