My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RFQ #26-07-01 Continuing Professional Architectural and Engineering Consulting Svcs
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
Miles Architecture
>
RFQ #26-07-01 Continuing Professional Architectural and Engineering Consulting Svcs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 1:30:35 PM
Creation date
8/31/2026 1:30:04 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> 16 <br />2600 Maitland Center Pkwy #295, <br />Maitland, FL 32751 <br />407-428-1024 <br />RFQ # 26-07-01 <br />CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES <br /> <br />Jail and connecting corridor between the 3-story building security vestibule and the intake <br />and release building. <br />Key Technical Focus Areas: <br />• Mechanical: Evaluate existing HVAC systems for capacity, condition, and zoning to <br />ensure proper ventilation, comfort, and compliance with detention facility <br />standards. <br />• Electrical: Review power distribution, lighting, and emergency systems to improve <br />reliability, energy eBiciency, and code compliance while minimizing disruption to <br />daily operations. <br />• Plumbing: Assess existing domestic water, sanitary, and vent systems for <br />functionality and required upgrades to support revised layouts or fixture <br />replacements. <br />• Fire Protection: Confirm system coverage and code compliance in accordance with <br />NFPA and local detention facility requirements. <br />Team Members: <br />• Brian Hessinger, PE | Mechanical Engineer <br />• Joe Harrill, PE | Electrical Engineer <br />• Jody McKenzie | Senior Electrical Engineer & Construction Administrator <br />Palms at Lake Underhill – Retail and Business Development <br />Contract Term: 2017 <br />Contact Name & Contact Information: <br />Dr. Neil Coskun, Managing Partner <br />Blue Castle Development <br />Phone: (321) 303-5706 <br />Contract Type: Mixed-Use Development <br />Multi-Building Retail Development <br />4 Multi-Tenant stand -alone Retail Buildings <br />• Building 1 | Construction in 2017 | 9,491 SF <br />• Building 2 | Construction in 2017 | 14,271 SF <br />• Building 3 | Construction Scheduled in 2026 | 11,293 SF <br />• Building 4 | Currently in Design | 9,000 SF <br />Status: Building 1 & 2 Completed 2017 | Building 3 - 2026 <br />Services: Architecture Design <br />This ongoing retail development consists of multiple stand-alone commercial buildings <br />designed to support flexible tenant occupancy and phased implementation. Our team <br />provided architectural design, consultant coordination, permitting support, and <br />interdisciplinary integration with structural and MEP engineering partners.
The URL can be used to link to this page
Your browser does not support the video tag.