|
<br />Experience Summary
<br />utility relocation coordination, stormwater management, and construction management, ensuring all
<br />improvements met ADA compliance, operational requirements, and regulatory standards.
<br />
<br />E15-WASD -02 Improvement, Upgrades and Expansion of Local Wastewater Pump Stations, WASD.
<br />Miami-Dade County, FL.
<br />This project includes complete design services including preliminary site investigation and inspection,
<br />surveying, hydraulic analysis, coordination with other municipalities and the public, preparation of design
<br />reports, preparation of drawings and contract specifications and preparation of design-build criteria
<br />packages, assistance during the permitting and procurement phases, engineering support during
<br />construction.
<br />• Pump Station 0409 (315 gpm). Ms. Aguirre serves as Project Engineer, leading the development of
<br />construction documents for the improvement and relocation of Pump Station 0409. Her
<br />responsibilities include hydraulic design updates, site layout refinement, coordination with utility
<br />agencies, and integration of operational and maintenance requirements into the final design
<br />package.
<br />• Pump Station 0407 (270 gpm). As Project Engineer, Ms. Aguirre supports engineering design and
<br />limited bid and construction assistance for Pump Station 0407. Her role focuses on evaluating existing
<br />conditions, performing pump station upgrade design, preparing technical specifications, and
<br />assisting with design clarifications during bidding.
<br />• Pump Station 0408 (250 gpm). Ms. Aguirre serves as Project Engineer for the design of
<br />improvements and relocation of Pump Station 0408, where she contributes to system modeling, site
<br />and civil layout, equipment selection, and development of permit-ready construction documents,
<br />along with providing limited support through the bid process.
<br />
<br />E15-WASD -03A-17PDSI002 Small Diameter Water & Wastewater Pipelines, Miami-Dade Water & Sewer
<br />Department. Miami-Dade County, FL.
<br />These projects include the design and implementation of water and sanitary sewer improvements to
<br />replace undersized infrastructure. Work starts with the preliminary engineering and exploration phase,
<br />which includes geotechnical investigations and topographic surveys in accordance with WASD
<br />procedures for horizontal and vertical controls. Technical specifications, including scope of work,
<br />sequence of construction, and instructions to bidders, are compiled for each project.
<br />• Engineering Services for Small Diameter Water Main Replacement Program (SDWMRP) within Tile
<br />- F13. Ms. Aguirre is the Project Engineer for this project, which consists of providing Engineering
<br />Design, topographic survey coordination, permits, specifications and Limited Bid and Construction
<br />Support services for the Design of a Small Diameter Water and Wastewater Pipelines. Ms. Aguirre is
<br />responsible for project coordination, overseeing task distribution, and ensuring the successful
<br />completion of all survey-related activities. Her role includes managing workflows, maintaining
<br />project organization, and facilitating communication between teams to ensure timely and accurate
<br />deliverables.
<br />
<br />19-20-019 Citywide Program Management Support Services. City of Miami, Miami-Dade County, FL.
<br />Ms. Aguirre served as Project Engineer for this assignment, supporting the delivery of Professional Land
<br />Surveying Services for the City of Miami’s Citywide Program Management Support Services for
<br />Stormwater Infrastructure. She assisted in coordinating survey activities along approximately 16,075 linear
<br />feet of roadway, ensuring the completion of full Right-of-Way surveys that extend 25 feet into adjacent
<br />private properties. Her responsibilities included reviewing field data, validating the documentation of
<br />property lines, driveways, pavement conditions, sidewalks, curbs and gutters, walls, access gates,
<br />markings, striping, and fences across ROW corridors ranging from 40 to 80 feet in width. Ms. Aguirre
<br />ensured that all survey work met project requirements and supported the development of accurate
<br />base maps for future stormwater design and infrastructure improvements.
<br />41
|