My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Premiere Design Solutions, Inc. Bid Document (26)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
Premiere Design Solutions, Inc
>
Premiere Design Solutions, Inc. Bid Document (26)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 1:34:48 PM
Creation date
8/31/2026 1:33:57 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Approach | Methodology <br />Based on the City of <br />Sunny Isles Beach’s Capital <br />Improvement Program (CIP), <br />the City faces the ongoing <br />challenge of improving <br />flood-prone areas through <br />strategic stormwater <br />infrastructure investments. <br />Based on the City of <br />Sunny Isles Beach’s Capital <br />Improvement Program <br />(CIP), the City faces the <br />challenge of enhancing <br />its public transportation <br />infrastructure by replacing <br />aging bus benches and <br />shelters throughout the <br />community while improving <br />transit accessibility and <br />passenger experience. <br />PDS supports flood mitigation initiatives through <br />precise surveying and mapping services that provide <br />reliable existing conditions data for resilient stormwater <br />infrastructure design. Under Project No. 19-014 Dania <br />Beach Southeast Drainage Improvements Phase 2, <br />PDS completed a 26,000 LF topographic route survey <br />for a 500-acre flood-prone area, mapping roadways, <br />drainage features, utilities, and right-of-way conditions <br />to support stormwater improvements. <br />Similarly, under Project No. 19-20-019 Citywide <br />Program Management Support Services, PDS <br />performed topographic and right-of-way surveys <br />covering approximately 26,550 LF of roadway for <br />the East Flagami Stormwater Infrastructure Project, <br />documenting existing infrastructure and site <br />conditions to support flood mitigation improvements. <br />This experience provides the accurate geospatial <br />data needed to help the City of Sunny Isles Beach <br />plan, design, and implement effective drainage <br />improvements in flood-prone areas. <br />PDS supports transit infrastructure improvements <br />through accurate surveying and mapping services that <br />establish existing conditions for the planning, design, <br />and implementation of accessible transit facilities. <br />Our approach includes detailed field data collection, <br />utility and site feature mapping, ADA assessments, <br />and reliable survey deliverables to support efficient <br />decision-making and constructible improvements. <br />Our experience includes PNC2119245P1 Consultant <br />Services for Transit Surveys, Infrastructure, and Shelter <br />Designs, where PDS provided surveying services for <br />20 work orders and approximately 500 bus shelters/ <br />stops, including data collection for ADA-compliant <br />transit improvements. Through V1018717R1 Architectural <br />and Engineering Services for the Transit Division, PDS <br />also supported surveying and mapping for more than <br />845 bus stops across 79 work orders. This experience <br />demonstrates PDS’s ability to deliver accurate <br />geospatial data and coordinated survey support to <br />help the City of Sunny Isles Beach modernize transit <br />amenities and improve accessibility. <br />Challenge PDS Approach <br />Challenge PDS Approach <br />60
The URL can be used to link to this page
Your browser does not support the video tag.