Laserfiche WebLink
4. Approach | Methodology <br />Based on the City of <br />Sunny Isles Beach’s Capital <br />Improvement Program <br />(CIP), the City faces the <br />challenge of enhancing <br />its public transportation <br />infrastructure by replacing <br />aging bus benches and <br />shelters throughout the <br />community while improving <br />transit accessibility and <br />passenger experience. <br />PDS supports park modernization initiatives through <br />comprehensive surveying and mapping services <br />that provide accurate existing conditions data for the <br />planning, design, and implementation of functional, <br />accessible, and enhanced recreational facilities. Services <br />include topographic mapping, boundary verification, <br />utility location, tree surveys, and documentation of <br />existing site conditions to support efficient design <br />development. <br />Our experience includes Project No. 12308-296 Parks <br />Bond and Parks Master Plan Design Implementation <br />Services, where PDS provided surveying and <br />underground utility location services for the City of <br />Fort Lauderdale’s Parks Bond Program, supporting <br />improvements across more than 250 acres and 25 <br />park locations. Under Project No. 2019-18 Parks Bond <br />Program Management Services, PDS performed <br />boundary, topographic, ALTA-compliant surveys, utility <br />and drainage mapping, sidewalk documentation, <br />and tree inventories for the City of Doral’s park <br />improvements, including a 5.5-acre (240,000 SF) survey <br />area. This experience demonstrates PDS’s ability to <br />deliver precise surveying and mapping solutions that <br />support successful park modernization while addressing <br />accessibility, functionality, and community needs. <br />Challenge PDS Approach <br />Project Execution Framework <br />A. Project Development Lifecycle. <br />PDS follows a structured, repeatable lifecycle to ensure consistency, transparency, and <br />control: <br />Project Initiation & Scope Review <br />Research & Pre-Field Planning <br />A kickoff scoping meeting establishes <br />project goals, scope, budget, schedule, <br />permitting needs, and risk factors. <br />Conduct boundary research, review <br />existing records, coordinate utilities, <br />plan survey control, obtain permits, and <br />prepare field logistics. <br />61