My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Premiere Design Solutions, Inc. Bid Document (26)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
Premiere Design Solutions, Inc
>
Premiere Design Solutions, Inc. Bid Document (26)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 1:34:48 PM
Creation date
8/31/2026 1:33:57 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Approach | Methodology <br />Field Coordination & Data Collection <br />Establish survey control, coordinate field <br />crews, perform utility locating, collect <br />survey data, and monitor field progress. <br />Client Coordination & Deliverables <br />Processing, Drafting & QA/QC <br />Provide project updates, address client <br />comments, finalize revisions, and deliver <br />signed and sealed survey documents. <br />Process field data, prepare survey <br />deliverables, coordinate field-to- <br />office workflows, and perform quality <br />assurance and quality control reviews. <br />Proven Performance <br />Delivery & Post-Completion Support <br />Deliver projects on schedule, within <br />budget, and with consistent quality to <br />support long-term client partnerships. <br />Complete project closeout, deliver <br />final documentation, and provide <br />ongoing technical support and client <br />coordination. <br />B. Fast-Track Project Delivery Approach <br />PDS supports fast-track projects by integrating early planning, constructability reviews, and proactive <br />coordination to achieve accelerated schedules while maintaining quality and budget control. By <br />engaging early in task authorization and project conception, PDS identifies delivery methods, phasing <br />strategies, permitting requirements, and construction constraints that may impact schedule or cost. <br />To support accelerated delivery, PDS applies the following strategies: <br />Proactive Planning <br />Early definition of project scope, <br />risks, utility conflicts, and permitting <br />requirements, supported by early survey <br />and data collection to establish reliable <br />baseline conditions. <br />Schedule Control <br />Detailed schedules are maintained using <br />project management tools to monitor <br />progress, track critical paths, and adjust <br />for field conditions, permitting timelines, <br />and construction constraints. <br />Phased Deliverables & Milestones <br />Design packages are advanced in <br />phases (30%, 60%, 90%, 100%) to allow <br />parallel coordination, early reviews, and <br />timely stakeholder feedback. <br />Concurrent Design & Permitting <br />Permitting activities are initiated during <br />design, with early Subsurface Utility <br />Engineering (SUE) to resolve conflicts <br />prior to construction and reduce <br />schedule risk. <br />62
The URL can be used to link to this page
Your browser does not support the video tag.