|
QUALIFICATIONS
<br />MIAMI DADE COUNTY PUBLIC SCHOOLS
<br />Design, CD’s, Permitting and CA for: Renovation and remodeling of classroom buildings, restrooms, and general campus facilities. Upgrade of interior finishes, furnishings as well as
<br />installation of all new technology features. Campus wide Arch., MEP, and Fire Protection renovations throughout the multi-building schools. Renovations included cleaning and repainting
<br />of all the exterior / Interior walls and doors, renovation of the HVAC systems in the classroom buildings, cafeteria, and administration building. Electrical upgrades for interior and exterior
<br />areas of several buildings, interior renovations in all classrooms and classroom bldgs., restrooms, renovation of the fire alarm and public address system and demolition of a building.
<br />PROJECTS: Leewood K-8 Center (Ongoing) Rainbow Park ES Reno. (2021)
<br />Pinecrest ES (Ongoing) Lake Stevens ES Reno. (2020)
<br />Miami Lakes Educational Center (Ongoing) Sunset Park ES Reno. (2019)
<br />Agenoria Paschal-Olinda ES Reno. (Ongoing) Coral Park ES Reno. (2017)
<br />Dr. Carlos J. Finlay ES (Ongoing) Florida City ES Reno. (2017)
<br />Dr. William A. Chapman House Historical Rest. & Reno. (Ongoing) Fairlawn ES Reno. (2017)
<br />North Glade ES Reno. (2024)
<br />Continuing Contract (2013 – 2018) (2022 – Present)
<br />Project Owner: Miami-Dade County Public Schools: Ms. Patricia Ataya, (305) 995-2235, pataya@dadeschools.net
<br />CITY OF TAMARAC
<br />PUBLIC SERVICE COMPLEX (TAMARAC, FL)
<br />Design/Build project, Hurricane Hardened Public Services Building is a one story, 20,000sf office/warehouse with (131) parking spaces
<br />surface parking lot, maintenance yard and hazardous materials building which includes 12,000sf of admin. offices with workstations,
<br />conference, and training rooms, plans storage, public restrooms, lunchroom, and city's centralized IT room. 8,000sf of forklift accessible
<br />warehouse and shop spaces with a 3,000sf secured warehouse, mechanical shop, electrical shop, manager, and supervisor offices.
<br />Men's lockers for up to (80) employees, female lockers for up to (10) employees, private showers and restrooms, and air-conditioned
<br />secured storage. (2009)
<br />Construction Cost: $5M
<br />Project Owner: City of Tamarac, Mr. Earl Henry, (954) 597-3758, earl.henry@tamarac.org
<br />SPORTS COMPLEX (TAMARAC, FL)
<br />Design/Build project, three new baseball fields with dugouts and bleachers, Batting cage with artificial turf, Sports field lighting, 5,000 SF
<br />concession building with second floor viewing area, Kitchen, Elevator, two new parking lots, resurfacing of existing lots, new playground
<br />with pavilion and safety surface, Fishing pier, Kiosk, Outdoor hockey rink, Exercise trail, Walking path and concrete paving on a 15-acre
<br />site. (2010)
<br />Construction Cost: $6M
<br />Project Owner: City of Tamarac, Mr. Earl Henry, (954) 597-3758, earl.henry@tamarac.org
<br />MAINLANDS PARK (TAMARAC, FL)
<br />Design/Build Project of approximately (23) acres of land with bisecting canal and existing boat ramps with a new design that includes:
<br />Walking trail, Fitness stations throughout, Nature kiosk, Fishing pier/observation platform, covered picnic tables, shaded benches
<br />throughout, public restroom building with storage, Landscaping, and Parking lot. (2009)
<br />Construction Cost: $2.5M
<br />Project Owner: City of Tamarac, Mr. Earl Henry, (954) 597-3758, earl.henry@tamarac.org
<br />TAMARAC PARK - RECREATION AND COMMUNITY CENTER (TAMARAC, FL)
<br />Design/Build project demolished the existing 10,000SF building and replaced it with a new 15,200 SF, two-story, precast hollow core slab,
<br />metal truss, metal roofed community center. As well as the installation of new dugouts and bleachers at the existing ball fields, new CCTV
<br />system and the reconfiguration of existing parking lots for proper circulation and positive drainage. The building also included an
<br />Instructional Kitchen, Game Room, Offices, Meeting rooms, Arts & crafts rooms, Concession stand / building and public restrooms. (2010)
<br />Construction Cost: $4M
<br />Project Owner: City of Tamarac, Mr. Earl Henry, (954) 597-3758, earl.henry@tamarac.org
<br />CITY OF CORAL GABLES
<br />VENETIAN POOL RENOVATIONS (CORAL GABLES, FL)
<br />Chisholm Architects was selected to conduct evaluations of specific issues relative to the existing architectural and structural systems of
<br />the Pool, Towers, and Pool Vessel at the Historic Venetian Pool in the City of Coral Gables as well as retrofit the café / concessions
<br />facility as well. (2026) Selected through continuing contract and again for Preservation A&E Svcs. (2022).
<br />Construction Cost: $1M.
<br />Project Owner: City of Coral Gables, Jean Solari, (305) 460-5053, jsolari@coralgables.com
<br />CITY OF SUNNY ISLES BEACH
<br />CONTINUING PROFESSIONAL ARCHITECTURAL AND
<br />ENGINEERING CONSULTING SERVICES (CCNA)
<br />RFQ NO. 26-07-01
<br />25
|