Laserfiche WebLink
QUALIFICATIONS <br />MIAMI DADE COUNTY PUBLIC SCHOOLS <br />Design, CD’s, Permitting and CA for: Renovation and remodeling of classroom buildings, restrooms, and general campus facilities. Upgrade of interior finishes, furnishings as well as <br />installation of all new technology features. Campus wide Arch., MEP, and Fire Protection renovations throughout the multi-building schools. Renovations included cleaning and repainting <br />of all the exterior / Interior walls and doors, renovation of the HVAC systems in the classroom buildings, cafeteria, and administration building. Electrical upgrades for interior and exterior <br />areas of several buildings, interior renovations in all classrooms and classroom bldgs., restrooms, renovation of the fire alarm and public address system and demolition of a building. <br />PROJECTS: Leewood K-8 Center (Ongoing) Rainbow Park ES Reno. (2021) <br />Pinecrest ES (Ongoing) Lake Stevens ES Reno. (2020) <br />Miami Lakes Educational Center (Ongoing) Sunset Park ES Reno. (2019) <br />Agenoria Paschal-Olinda ES Reno. (Ongoing) Coral Park ES Reno. (2017) <br />Dr. Carlos J. Finlay ES (Ongoing) Florida City ES Reno. (2017) <br />Dr. William A. Chapman House Historical Rest. & Reno. (Ongoing) Fairlawn ES Reno. (2017) <br />North Glade ES Reno. (2024) <br />Continuing Contract (2013 – 2018) (2022 – Present) <br />Project Owner: Miami-Dade County Public Schools: Ms. Patricia Ataya, (305) 995-2235, pataya@dadeschools.net <br />CITY OF TAMARAC <br />PUBLIC SERVICE COMPLEX (TAMARAC, FL) <br />Design/Build project, Hurricane Hardened Public Services Building is a one story, 20,000sf office/warehouse with (131) parking spaces <br />surface parking lot, maintenance yard and hazardous materials building which includes 12,000sf of admin. offices with workstations, <br />conference, and training rooms, plans storage, public restrooms, lunchroom, and city's centralized IT room. 8,000sf of forklift accessible <br />warehouse and shop spaces with a 3,000sf secured warehouse, mechanical shop, electrical shop, manager, and supervisor offices. <br />Men's lockers for up to (80) employees, female lockers for up to (10) employees, private showers and restrooms, and air-conditioned <br />secured storage. (2009) <br />Construction Cost: $5M <br />Project Owner: City of Tamarac, Mr. Earl Henry, (954) 597-3758, earl.henry@tamarac.org <br />SPORTS COMPLEX (TAMARAC, FL) <br />Design/Build project, three new baseball fields with dugouts and bleachers, Batting cage with artificial turf, Sports field lighting, 5,000 SF <br />concession building with second floor viewing area, Kitchen, Elevator, two new parking lots, resurfacing of existing lots, new playground <br />with pavilion and safety surface, Fishing pier, Kiosk, Outdoor hockey rink, Exercise trail, Walking path and concrete paving on a 15-acre <br />site. (2010) <br />Construction Cost: $6M <br />Project Owner: City of Tamarac, Mr. Earl Henry, (954) 597-3758, earl.henry@tamarac.org <br />MAINLANDS PARK (TAMARAC, FL) <br />Design/Build Project of approximately (23) acres of land with bisecting canal and existing boat ramps with a new design that includes: <br />Walking trail, Fitness stations throughout, Nature kiosk, Fishing pier/observation platform, covered picnic tables, shaded benches <br />throughout, public restroom building with storage, Landscaping, and Parking lot. (2009) <br />Construction Cost: $2.5M <br />Project Owner: City of Tamarac, Mr. Earl Henry, (954) 597-3758, earl.henry@tamarac.org <br />TAMARAC PARK - RECREATION AND COMMUNITY CENTER (TAMARAC, FL) <br />Design/Build project demolished the existing 10,000SF building and replaced it with a new 15,200 SF, two-story, precast hollow core slab, <br />metal truss, metal roofed community center. As well as the installation of new dugouts and bleachers at the existing ball fields, new CCTV <br />system and the reconfiguration of existing parking lots for proper circulation and positive drainage. The building also included an <br />Instructional Kitchen, Game Room, Offices, Meeting rooms, Arts & crafts rooms, Concession stand / building and public restrooms. (2010) <br />Construction Cost: $4M <br />Project Owner: City of Tamarac, Mr. Earl Henry, (954) 597-3758, earl.henry@tamarac.org <br />CITY OF CORAL GABLES <br />VENETIAN POOL RENOVATIONS (CORAL GABLES, FL) <br />Chisholm Architects was selected to conduct evaluations of specific issues relative to the existing architectural and structural systems of <br />the Pool, Towers, and Pool Vessel at the Historic Venetian Pool in the City of Coral Gables as well as retrofit the café / concessions <br />facility as well. (2026) Selected through continuing contract and again for Preservation A&E Svcs. (2022). <br />Construction Cost: $1M. <br />Project Owner: City of Coral Gables, Jean Solari, (305) 460-5053, jsolari@coralgables.com <br />CITY OF SUNNY ISLES BEACH <br />CONTINUING PROFESSIONAL ARCHITECTURAL AND <br />ENGINEERING CONSULTING SERVICES (CCNA) <br />RFQ NO. 26-07-01 <br />25