|
QUALIFICATIONS
<br />CITY OF MIAMI
<br />DOUGLAS PARK COMMUNITY CENTER (MIAMI, FL) (ONGOING)
<br />(Designed for Sea-Level Rise) This community facility is the entry and focal point of Douglas Park, it will be constructed in an
<br />environmentally sensitive area (Contaminated) and on structural piles, it will consist of multi-purpose spaces, administrative offices,
<br />Snack bar / kitchen, public restrooms, Park maintenance storage space, Classroom and crafts spaces, City of Miami NET office
<br />and multi-purpose outdoor courtyard. Selected through continuing contract (2015).
<br />Construction Cost: $9M
<br />Project Owner: City of Miami: Mr. Anthony Amador, PM, (305)416-1747, aamador@miamigov.com
<br />ANTONIO MACEO PARK (MIAMI, FL)
<br />A/E Services for a new restroom building with storage for the City of Miami Capital Improvements Program for the City of Miami
<br />Parks and Recreation Department. (2025) Selected through continuing contract (2015).
<br />Construction Cost: $1M
<br />Project Owner: City of Miami: Mr. Esteban Rubiano, PM, (305)416-1753, erubiano@miamigov.com
<br />KENNEDY PARK (MIAMI, FL)
<br />A/E Services for a new restroom building with storage for the City of Miami Capital Improvements Program for the City of Miami
<br />Parks and Recreation Department. (2023)Selected through continuing contract (2015).
<br />Construction Cost: $1M
<br />Project Owner: City of Miami: Mr. Richard Pope, PM, (305)416-1753, rpope@miamigov.com
<br />VIRGINIA KEY MARITIME CENTER / DCP (MIAMI, FL) (ON HOLD)
<br />(Designed for Sea-Level Rise.) Design Criteria Professionals for a new (3) story, plus roof top 30,000sf multi-purpose facility that
<br />includes: Restaurant, Exhibition space, Visitor center, administrative offices for (MMS) The Miami Marine Stadium., Dockmaster
<br />offices. Plus, the talent facility for any Miami Marine Stadium events. Selected through continuing contract (2015).
<br />Construction Cost: $10M
<br />Project Owner: City of Miami: Mr. Carlos Lozano, PM, (305)416-1247, clozano@miamigov.com
<br />THEODORE GIBSON PARK IND. BB ARENA (MIAMI, FL) (ONGOING)
<br />A/E Services for renovation of indoor basketball arena and facility improvements. Selected through continuing contract (2015).
<br />Construction Cost: $875K
<br />Project Owner: City of Miami: Mr. Ricardo Rodriguez, PM, (305)416-1317, rrodriguez@miamigov.com
<br />SHENANDOAH PARK (MIAMI, FL)
<br />Shenandoah Park Recreation Bldg Improvements: Design, CD’s and Construction Administration of phased renovation of the
<br />expansion of the existing recreation building at Shenandoah Park. Shenandoah Park Parking Area and General Park
<br />Improvements: Design, Construction Documentation and Construction Administration for improvements to existing parking area
<br />and drives, replacement of tennis court fencing, installation of parking barriers along streetscape and installation of new drainage
<br />system throughout park to repair flooding issues. Shenandoah Park Child Care Facility: Design and Contract Documents for a
<br />new 6,500sf Pre-K/childcare facility. Shenandoah Park Temporary Fire Station: Design, Construction Documentation, and
<br />Construction Administration for the neighborhood temporary fire station. Shenandoah Park Pool Improvements: Design,
<br />Construction Documentation, and Construction Administration for the improvements to existing pool facility including ADA upgrades
<br />and new pool heater. Completed (2011)
<br />Construction Cost: $2M
<br />Project Owner: City of Miami: Mr. Andre Bryan, (305)416-1211, abryan@miamigov.com
<br /> OTHER PROJECTS: Miami City Cemetery Maintenance Bldg. (ONGOING) Selected through continuing contract.
<br />Spring Garden Point Park (ONGOING) Selected through continuing contract.
<br />Commissioner King Offices Renovations (2022) Selected through continuing contract.
<br />Commissioner Diaz de La Portilla Office Renovations (ONGOING) Selected through continuing contract.
<br />David Herring Facility – 40 Year recertification (ONGOING/HOLD) Selected through continuing contract.
<br />Lawrence and Riverview Pump Stations (2017) Selected through continuing contract.
<br />Miami Police Station ADA and Feasibility Study (Feasibility Report Completed) Selected through continuing contract.
<br />Continuing Contract (2015-CURRENT) and again in (2022)
<br />CITY OF SUNNY ISLES BEACH
<br />CONTINUING PROFESSIONAL ARCHITECTURAL AND
<br />ENGINEERING CONSULTING SERVICES (CCNA)
<br />RFQ NO. 26-07-01
<br />26
|