Laserfiche WebLink
QUALIFICATIONS <br />CITY OF MIAMI BEACH <br />FLAMINGO PARK CHILDCARE CENTER (MIAMI BEACH, FL) (ONGOING) <br />Providing A&E services for the relocation of the Rainbow Daycare Center to Flamingo Park. This includes analysis of the existing <br />building function and spaces, and construction of a new +/- 5,500 square foot facility, including outdoor space / playground area, <br />staff areas, storage, administration offices, and more. Selected through continuing contract (2020). <br />Construction Cost: $105K <br />Project Owner: City of Miami Beach <br />OTHER PROJECTS: Flamingo Youth Center Facility (ONGOING) Selected through continuing contract. <br />Continuing Contract (2020-CURRENT). <br />CITY OF MIRAMAR <br />SILVER LAKES PICKLEBALL COURTS (MIRAMAR, FL) <br />Basic Professional Architectural & Engineering Services for (4) Pickle Ball courts with all appurtenances to include: Court <br />Lighting, (4) Pickleball Courts / Hardcourt, Fencing, Spectator Seating, Water Fountain. (2025) Selected through continuing <br />contract (2022). <br />Construction Cost: $400K <br />Project Owner: City of Miramar: Mr. Billy Neal, (954) 601-3344, bdneal@miramarfl.gov <br />OTHER PROJECTS: Business Office Sharing (ONGOING) Selected through continuing contract. <br />Continuing Contract (2022-CURRENT). <br />VILLAGE OF BISCAYNE PARK <br />Park & Rec Center Electrical Panel Design (ONGOING) Selected through continuing contract. <br />Ed Burke Park Parking Master (ONGOING) Selected through continuing contract. <br />Continuing Contract (2023-CURRENT) <br />CITY OF DEERFIELD BEACH <br />TIGNER COMMUNITY CENTER (DEERFIELD BEACH, FL) <br />Design Build proposal / competition for the City of Deerfield Beach, a new 2-story, 14,000 sf community center that connects to <br />the existing gymnasium on-site. The new community center design includes a banquet space, offices, outdoor exercise area, <br />lounge, computer lab, restrooms, and multi-purpose spaces. A designated drop-off/pick-up area was also created to maximize <br />pedestrian and vehicular flow. (2021). <br />Construction Cost: $10M <br />Project Owner: City of Deerfield Beach <br />CITY OF HOLLYWOOD <br />FIRE TRAINING & MAINTENANCE BUIDLING (HOLLYWOOD, FL) (ONGOING) <br />Analysis of entire HVAC system and ergonomic efficiencies in functional areas. <br />Construction Cost: $50K <br />Project Owner: City of Hollywood, Karyn Sashi, MSCM, LEED AP, (754) 294-6118, ksashi@hollywoodfl.org <br />CITY OF SUNNY ISLES BEACH <br />CONTINUING PROFESSIONAL ARCHITECTURAL AND <br />ENGINEERING CONSULTING SERVICES (CCNA) <br />RFQ NO. 26-07-01 <br />27