My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.E. Chisholm Architects. Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
R.E. Chisholm Architects. Inc
>
R.E. Chisholm Architects. Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 1:36:37 PM
Creation date
8/31/2026 1:34:55 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />approximately one year, PSI presented a No Further Action with Conditions (NFAC) RMO Level II proposal as <br />defined in Chapter 62-780.680(2) of the Florida Administrative Code (FAC). After the approval of the NFAC <br />proposal, PSI worked with the City obtain the required documentation for a Declaration of Restrictive Covenant <br />(DRC) and negotiated on the City’s behalf with the Broward County Environmental Protection and Growth <br />Management Department (EPGMD),and the FDEP for a reduced size of restricted area to be placed as an <br />institutional control on the property. <br />PSI was part of this environmental issue from when the USTs were first found through contamination <br />assessment, and ultimately the environmental regulatory closure; all while maintaining the original construction <br />and occupancy schedules. Based on the work that PSI did, this property has achieved a Site Rehabilitation Order <br />with Conditions (SRCOC). <br />Client/Owner: City of Pompano Beach, 2005 NW 9th Street, Pompano Beach, Florida 33066 <br />Contact: Fernand Thony, Go Bond and Innovation District Director | fernand.thony@copbfl.com | 954-786-7923 <br />Performance Period: April 2022 – December 2025 <br />Project Value: $84,775.00 <br />Key Personnel: Mark Kalivoda, PE – Project Manager; Jeremy Cottrell – Technician; Manual Porras – Technician; <br />Angela Garzia – Principal Consultant <br />Services Provided: Soil Sampling, Soil Source Removal, Tank Closure Assessment, Site Assessment Report, <br />Groundwater Monitoring Program, No Further Actions with Conditions Proposal, Site rehabilitation Completion <br />Order <br /> <br /> <br />43
The URL can be used to link to this page
Your browser does not support the video tag.