My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.E. Chisholm Architects. Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
R.E. Chisholm Architects. Inc
>
R.E. Chisholm Architects. Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 1:36:37 PM
Creation date
8/31/2026 1:34:55 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROFESSIONAL ENGINEERING SERVICES <br />Surfside, FL <br />OWNER <br />Town of Surfside <br />CLIENT <br />Town of Surfside <br />PROJECT DURATION <br />2021 - 2025 <br />REFERENCE <br />Andre Eugent <br />CIP Director <br />9293 Harding Avenue, <br />Surfside, FL 33154 <br />(305) 861-4863 <br />aeugent@townofsurfsidefl.gov <br />KEITH PRACTICE LINE <br />Water <br />As part of the Town of Surfside’s General Engineering Contract, KEITH provides the <br />Town with civil services to support the development of various projects related to the <br />Town’s infrastructure. Projects under this contract include: <br />NPDES MS-4 Monitoring and Reporting: KEITH is responsible for providing <br />professional engineering services for National Pollutant Discharge Elimination <br />Systems (NPDES) and Stormwater Regulatory Monitoring and Compliance Reporting <br />to the Florida Department of Environmental Protection (FDEP) on behalf of the Town. <br />KEITH is responsible for processing the required annual reporting of the Town’s <br />current NPDES MS-4 Permit to FDEP. <br />Abbott Avenue Phase 1 and Phase 2 Drainage Improvements: KEITH assisted with <br />drainage improvements on Abbott Avenue between 90th Street and 96th Street. <br />KEITH provided services including civil engineering and utility coordination. The <br />KEITH Team evaluated and assessed the existing stormwater drainage conditions, <br />prepared reports and cost estimates from ICPR models and calculations for seven <br />improvement options, and presented the conclusions for the selection of the best <br />and most cost-effective solution. KEITH also evaluated existing land use development <br />codes, stormwater ordinances, and MS-4 reporting with recommendations and <br />ordinance revisions for compliance and exceedance of federal, state, and local <br />requirements. Sea level rise projections in accordance with Southeast Florida Regional <br />Climate Change Compact were considered in assessments. Phase II proceeded with <br />the development of construction documents and permit processing. KEITH assisted <br />in securing a 2022 FDEP Flooding and Sea Level Resiliency Grant to cover most of the <br />estimated construction costs. <br />MD-RER Sanitary Sewer Certification: KEITH provided civil engineering services for <br />the 5-Year Update certification required by Miami-Dade County. KEITH conducted <br />reviews of the exisiting sanitary sewer and tranmission model and supplied <br />information regarding upgrades and modifications to the Town. <br />49
The URL can be used to link to this page
Your browser does not support the video tag.