Laserfiche WebLink
RFQ-26-07-01-0-2026/GC <br />RELEVANT EXPERIENCE <br />Districtwide Traffic Operations Safety Studies, FDOT District Four, FL — Project engineer. <br />Kimley-Horn is performing task work orders ranging from safety studies, safety reviews, fatal <br />crash reviews, lighting assessments, minor designs, crosswalk warrant analysis, operational <br />analysis, and qualitative assessments. Involves in all facets of the contract including field reviews, <br />countermeasure development, economic analysis, documentation, stakeholder coordination, <br />presentations, scope development, and subconsultant management. Kimley-Horn is providing traffic <br />operations and safety studies services through a task work order based contract for initiatives to <br />improve safety for all road users. Work orders include intersection and corridor safety studies, 3R <br />safety reviews, pedestrian and bicycle safety assessments, crosswalk warrant analysis, lighting <br />feasibility studies, concept plan development, and operational analysis. This contract was recently <br />renewed. <br />ITS and Smart Parking System Program Management, Miami Beach, FL — Project <br />engineer. Kimley-Horn is developing a project system engineering management plan, concept <br />of operations, project plan, and procurement documents for a Smart Cities initiative combining <br />ITS and smart parking. The project will deploy cameras, arterial dynamic message signs, vehicle <br />detection, parking occupancy information to communicate real time traffic and parking conditions <br />throughout the City. Also through this contract, Kimley-Horn is providing hot spot signal timing <br />support for the City of Miami Beach in coordination with Miami-Dade County. <br />Districtwide Complete Streets Contract, FDOT District Six, South Miami, FL — Project <br />engineer. Kimley-Horn is currently supporting FDOT District Six, performing professional services <br />and development, evaluation, and implementation of complete streets projects through an ongoing <br />districtwide contract. The goal of this contract is to improve corridor safety, mobility and access, <br />and quality of life for all transportation users. Kimley-Horn’s duties include the preparation of <br />Complete Street Analysis for arterials or collector road corridors, context-sensitive multimodal <br />community transportation network planning, and cost feasible complete street improvements and <br />strategy identification. Deliverables include recommendations for cost feasible improvements/ <br />strategies and summary of associated project phasing and funding. In addition, Kimley-Horn is <br />responsible for various tasks including review of Complete Streets pilot program evaluations, <br />plan reviews, design plan development, GIS mapping, and context classification review of FDOT <br />roadways and projects. <br />Leading Pedestrian Interval Feasibility Studies, FDOT District Six, FL — Project <br />engineer. Kimley-Horn is conducting a Leading Pedestrian Interval (LPI) Need assessment for five <br />intersections along SR 5/Biscayne Boulevard in Miami-Dade County. Tasks include analyzing crash <br />data, summarizing turning movement and pedestrian volumes, performing Synchro analysis for two <br />peak periods for the existing and proposed conditions, and coordinating with Miami-Dade County <br />Traffic Signals and Signs Division to obtain input for draft recommendations <br />PROFESSIONAL CREDENTIALS <br /> ƒMaster, Business <br />Administration, University <br />of Florida <br /> ƒBachelor of Science, Civil <br />Engineering, University of <br />Florida <br /> ƒProfessional Engineer in <br />Florida #90968 <br />SPECIAL QUALIFICATIONS <br /> ƒSix years of experience in <br />transportation engineering <br />and operational analysis. <br /> ƒHas led traffic operational <br />analysis efforts for <br />various traffic studies and <br />safety studies developing <br />initiatives to identify and <br />address traffic needs and <br />improve safety for all road <br />users. <br /> ƒOperational analysis <br />experience includes <br />freeway operation analyses, <br />arterial corridor operation <br />analyses, signal operation <br />analyses and signal warrant <br />studiesSafety analysis <br />experience includes fatal <br />crash reviews, safety <br />reviews, leading pedestrian <br />interval feasibility studies, <br />and lane repurposing <br />before and after studies <br /> ƒProficient in Synchro, <br />HCS, SIDRA, AutoCAD and <br />MicroStation <br />DEREK D’ADESKY, PE <br />Traffic Engineer <br />9 YEARS OF EXPERIENCE <br />65