Laserfiche WebLink
PA+M <br />VALUE ENGINEERING <br />Value Engineering is a systematic process designed to focus and improve upon the major elements of projects. We at Chisholm Architects <br />will employ a multi-disciplined team of experts to develop recommendations aimed at improving the value of the project during its early <br />design phases should Value Engineering be necessary or required. <br />QA/QC QUALITY ASSURANCE AND CONTROL <br />Quality is the result of a cooperative partnership between the providers of project development services <br />(Architecture/Engineering services and technical) and those responsible for Quality Assurance. Those <br />responsible for Quality Assurance must review or audit these products and services to ensure the Quality <br />Control efforts are achieving desired results. Those providing project development services must implement <br />Quality Control to ensure that products and services meet or exceed expectations of quality. <br />Our team seeks the optimum blend of scheduling, performance, constructability, maintainability, <br />environmental awareness, safety, and cost consciousness. As well as a management technique that uses <br />a systematized approach to seek out the best functional balance between the cost, reliability, and <br />performance of the project. <br />A QUALITY ASSURANCE review will involve representatives from all disciplines to review a list of project <br />elements that are considered to represent the overall quality of the work. <br />QUALITY CONTROL is an ongoing deliberate process, planned and carried out by the provider of design services. <br />A Quality Control (QA/QC) process must adhere to three basic principles: <br />1.Prevent errors from being introduced, at least as much effort should be placed in preventing errors as in finding the errors later. <br />2.Ensure that errors are detected and corrected as early as possible. Therefore, quality controls, which include checking and back- <br />checking procedures, must be implemented during all phases of the work. <br />3.Eliminate the causes of the errors as well as the errors themselves. By removing the cause, the quality process has been improved. <br />Quality control is based on: <br />•Quality control should ensure the work is done correctly the first time by focusing on preventing problems or errors rather than <br />reacting to them. <br />•Quality is controlled by proper and adequate training, planning, coordination, supervision, and technical direction, proper definition <br />and a clear understanding of job requirements. <br />•Quality is verified through checking, reviewing, and monitoring of work activities, with documentation by experienced individuals <br />who are not directly responsible. <br />To implement a Quality Control plan, the A/E Project Manager: <br />•Selects and assigns qualified professionals to perform the project tasks. <br />•Assigns qualified specialists to oversee all elements of the work and carry out a consistent, deliberate program of quality control. <br />•Continually improves the quality process. <br />•Makes certain that all personnel involved in performing the work have a clear understanding of the scope and intent of the overall <br />project, and the appropriate design criteria and environmental concerns, in order to ensure that the work product meets or exceeds <br />the expectations of the client. <br />•Assures that designers and reviewers have a clear understanding of the work requirements, responsibilities, project schedule, <br />deadlines, and completion dates. <br />•Arranges peer reviews to be conducted by qualified personnel outside of design team. Documents the quality control process <br />properly, to the degree appropriate to each project. <br />SCHEDULING & COST CONTROL <br /> <br />All our projects have been completed on their realistic time and budgets. <br />Those that have not, have been due to a variety of reasons, such as unrealistic timelines and/or budgets or third-party delays which are <br />beyond any control of the Owner or A/E. We at Chisholm Architects make a concerted effort to meet timelines and budgets regardless <br />of second- or third-party delays, and in the variety of instances we cannot, they are always delays which can be attributed to other <br />parties, mostly due to unforeseen or third-party circumstances. However, we always maintain the client’s interest first and foremost. <br />Maintaining the established project schedule and costs will be critical to the success of this project. The REC team <br />understands this and has been successful at delivering many projects. <br />CITY OF SUNNY ISLES BEACH <br />CONTINUING PROFESSIONAL ARCHITECTURAL AND <br />ENGINEERING CONSULTING SERVICES (CCNA) <br />RFQ NO. 26-07-01 <br />86