Laserfiche WebLink
3 <br /> <br />Ross Engineering, Inc. |3325 S University Drive, Suite 111, Davie, FL |954-318-0624 <br /> <br />17670 NW 78th Ave., Ste 214, Miami, FL 33015 | P: 786.468.8304 | F: 305.392-1019 | www.rossengineers.com <br />August 14, 2026 <br />City of Sunny Isles Beach <br />Procurement Department <br />18070 Collins Avenue <br />Sunny Isles Beach, Florida 33160 <br />RE: RFQ No. 26-07-01 – Continuing Professional Architectural and Engineering Consulting Services (CCNA) <br />Discipline 3 – General Civil Engineers <br />Dear Members of the Evaluation Committee: <br />Ross Engineering, Inc. is pleased to submit our qualifications to the City of Sunny Isles Beach for RFQ No. 26- <br />07-01, Continuing Professional Architectural and Engineering Consulting Services, under Discipline 3 – General <br />Civil Engineers. As the City’s incumbent continuing civil engineering consultant, selected under the prior <br />RFQ No. 20-07-01, Ross brings established familiarity with the City’s infrastructure, coordination procedures, <br />project delivery expectations, and local conditions. We welcome the opportunity to continue supporting the <br />City with responsive, practical, and cost-effective professional engineering services for its roadway, drainage, <br />stormwater, utility, infrastructure, facility, and capital improvement needs. <br />Established in 2003, Ross Engineering is a Florida civil and environmental engineering consulting firm with <br />more than two decades of experience serving municipalities, counties, public works agencies, educational <br />institutions, parks, utility providers, and other public-sector clients throughout South Florida. From our Miami- <br />Dade County office, Ross can mobilize quickly for meetings, field investigations, emergency or time-sensitive <br />assignments, and coordination with City staff, regulatory agencies, utilities, contractors, and other project <br />stakeholders. <br />Ross has assembled a focused multidisciplinary team tailored to the services anticipated under this <br />continuing services contract. SGM Engineering, Inc. will serve as Ross’s subconsultant for Mechanical, HVAC, <br />and Plumbing Engineering, providing specialized support for assignments involving mechanical systems, <br />HVAC, plumbing, pumping and piping systems, municipal facilities, and related study, design, and construction- <br />phase services. Thomas J. Kelly, Inc. will serve as Ross’s subconsultant for Surveying and Mapping, providing <br />professional surveying services including topographic, boundary, right-of-way, design, and construction- <br />related surveys and mapping. Together, these firms complement Ross Engineering’s core civil engineering <br />capabilities and provide the City with a coordinated team for civil, MEP, and surveying needs. Ross will remain <br />the Prime Consultant and civil engineering lead, integrating all supporting services into a unified scope, <br />schedule, quality-control process, and set of project deliverables. <br />Ross’s qualifications are further strengthened by our successful performance under the City’s current <br />continuing civil engineering contract. Through this relationship, our team has developed first-hand knowledge <br />of the City’s infrastructure, coastal drainage conditions, roadway constraints, permitting environment, and <br />coordination requirements. One representative assignment is the NE 172nd Street Roadway and Drainage <br />Improvements Project, where Ross provided professional civil and roadway drainage engineering services <br />within a constrained municipal corridor near the Intracoastal Waterway. Services included topographic and <br />route surveying, ICPR hydrologic and hydraulic analysis, roadway and drainage design, evaluation of existing <br />exfiltration trenches and gravity drainage wells, pump system improvements, permitting, preparation of <br />signed and sealed construction documents, bidding and preconstruction assistance, shop drawing review, <br />field observations, as-built review, final walkthrough, punch-list preparation, and closeout assistance. <br />That assignment provided Ross with valuable familiarity with the City’s infrastructure, coastal drainage conditions, <br />roadway constraints, review procedures, and coordination requirements. It also demonstrates our ability to work <br />effectively with the City, Miami-Dade County regulatory agencies, the Florida Department of Environmental <br />Protection, contractors, utility representatives, surveyors, and other stakeholders to deliver improvements that are <br />practical, permittable, constructible, maintainable, and responsive to the needs of the community.