My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ross Engineering, Inc. Bid Document (19)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
Ross Engineering, Inc
>
Ross Engineering, Inc. Bid Document (19)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 1:41:19 PM
Creation date
8/31/2026 1:40:26 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
56 <br />City of Sunny Isles Beach | RFQ 26-07-01 <br />Continuing Professional Architectural and Engineering | General Civil Engineer <br />4.3 PROJECT ORGANIZATION AND ACCOUNTABILITY <br />Ross provides a streamlined management structure with direct access to senior decision-makers and <br />one clear line of responsibility. The same three individuals lead every task order, giving the City continuity <br />of accountability across the life of the contract. <br />Melissa Ross, MSCE. Principal-in-Charge. Melissa provides executive oversight of <br />the continuing contract and is responsible for contract-level coordination, resource <br />allocation, staffing continuity, and overall accountability. She remains accessible to <br />the City’s Project Manager for staffing priorities, competing deadlines, contractual <br />concerns, and the commitment of additional resources. <br />Robert J. Ross, PE, LEED AP. Project Manager and Primary Point of <br />Contact. Robert manages the day-to-day performance of individual task orders and <br />is the principal project-level contact with the City. He leads scope development and <br />the WBS, assigns staff, coordinates subconsultants, manages schedules and budgets, <br />conducts progress meetings, oversees permitting, tracks review comments, and <br />coordinates bidding and construction-phase services. Robert also keeps the City’s <br />Project Manager informed of status, decisions, outstanding information, potential risks, and <br />recommended corrective actions. <br />Raymond Rammo, PE. Technical Advisor and QA/QC Lead. Raymond provides <br />independent senior technical guidance and leads Ross’s quality assurance and quality <br />control process, reviewing design criteria, calculations, modeling, plans, reports, <br />specifications, permitting requirements, cost estimates, constructability, interdisciplinary <br />coordination, and construction-phase technical responses. He oversees formal reviews at <br />project milestones and confirms that significant technical comments are resolved before <br />documents are submitted to the City. <br />This management team is supported by engineering analysts, civil designers, engineer interns, CAD- <br />production personnel, documentation staff, and construction and field-support personnel. Supporting <br />subconsultants provide Mechanical/HVAC/Plumbing Engineering, Surveying and Mapping as required. <br />Ross remains the prime consultant and civil engineering lead; all supporting work is coordinated through <br />Robert and reviewed under Raymond’s QA/QC leadership. The structure gives the City direct principal <br />involvement, a dedicated Project Manager, independent senior technical review, and sufficient production <br />capacity to support multiple concurrent assignments.
The URL can be used to link to this page
Your browser does not support the video tag.