57 <br />City of Sunny Isles Beach | RFQ 26-07-01 <br />Continuing Professional Architectural and Engineering | General Civil Engineer <br />4.4 TASK-ORDER WORK PLAN <br />Ross applies the following work plan to each assignment. The phases are combined, expanded, accelerated, <br />or omitted as appropriate to the task order, and each phase carries defined deliverables, review points, <br />and budget drawn from the task-order WBS. <br />Phase Ross Engineering’s Approach <br />1. Authorization and Scope <br />Confirmation <br />Review the City’s request, confirm objectives and deliverables, identify <br />required personnel and subconsultants, conduct the kickoff meeting, and <br />establish the authorized scope, WBS, schedule, budget, communication <br />procedures, and responsibilities. <br />2. Existing Conditions and <br />Investigation <br />Review available records; perform site observations; coordinate surveying, <br />utility locating, and specialty investigations when provided or separately <br />authorized by the City; and identify physical, regulatory, operational, and <br />public-access constraints. <br />3. Analysis and Preliminary <br />Recommendations <br />Complete applicable modeling, calculations, condition assessments, <br />feasibility analysis, permit research, alternatives evaluation, and preliminary <br />cost comparisons. Present major findings and obtain City direction. <br />4. Design Development Prepare and coordinate the applicable 30%, 60%, 90%, and 100% documents/ <br />plans, calculations, specifications, quantities, cost estimates, permit materials, <br />and responses to City comments. <br />5. Permitting and Bidding Coordinate with regulatory agencies, perform pre-application meetings, <br />respond to permit comments, support pre-bid activities, answer bidder <br />questions, prepare addenda, evaluate bids, and assist the City with <br />recommendation for award. <br />6. Construction-Phase Services Review submittals and RFIs, attend meetings, conduct authorized <br />observations or inspections, document field conditions, evaluate proposed <br />changes, assist with payment and change-order reviews, and coordinate <br />permit certifications. <br />7. Closeout Conduct final observations, prepare and verify punch-list items, review <br />as-built information and record drawings, assist with permit closure and <br />certifications, and provide the City with final project records. <br />The City requires a design schedule, construction cost estimates by phase, coordinated design <br />services, progress reviews at the 30%, 60%, 90%, and 100% stages, permitting, complete construction <br />documents, construction administration, responses to RFIs, and revised record drawings at <br />completion. This work plan incorporates each of those requirements directly, and the milestone <br />reviews it establishes are the same points at which Ross updates cost estimates (Section 4.5.1) and <br />performs formal QA/QC (Section 4.5.3). <br />• MILESTONE DESIGN REVIEWS <br /> »30%: Establish the design basis, preliminary layout, design criteria, major utility considerations, <br />permitting strategy, schedule, and initial cost estimate; confirm overall direction before detailed <br />design proceeds. <br /> »60%: Advance the approved concept with coordinated plans, calculations, utilities, supporting <br />disciplines, preliminary specifications, updated quantities, and an updated cost estimate. <br /> »90%: Documents substantially complete; perform formal QA/QC and constructability reviews, <br />confirm interdisciplinary coordination, reconcile plans with specifications and bid items, and <br />update the construction cost estimate and schedule. <br /> »100%: Address final comments; issue signed and sealed documents, final specifications, <br />quantities, bid information, permit-response materials, and the final opinion of probable