<br />City of Sunny Isles Beach | RFQ 26-07-01
<br />Continuing Professional Architectural and Engineering | General Civil Engineer
<br />construction cost.
<br />4.5 APPROACH TO PROJECT MANAGEMENT
<br />This subsection responds to the three elements on
<br />which the City scores project management: Cost Control,
<br />Scheduling, and Quality Control/Quality Assurance. All
<br />three are driven from the same task-order WBS and are
<br />managed on earned-value principles, so that at any point
<br />in an assignment Ross can tell the City what has been
<br />produced, what it has cost, and where the work stands
<br />against schedule.
<br />• 4.5.1 COST CONTROL, COST ESTIMATING, AND VALUE ENGINEERING
<br />Ross manages two budgets on every assignment: the authorized professional-services (fee) budget
<br />and the anticipated construction budget. Both are controlled with the same discipline.
<br /> »Controlling the professional-services budget. At authorization, Robert builds the fee budget on
<br />the task-order WBS, allocating labor hours, subconsultant amounts, and expenses to each activity
<br />and phase. This baseline becomes the yardstick for the assignment. At each reporting period, Ross
<br />estimates the percent complete of each task against measurable milestones, not simply hours
<br />spent, and compares the value of work actually produced to both the labor expended (a cost
<br />check) and the planned progress (a schedule check). When a variance develops, Ross determines
<br />the cause, recalculates the effort required to complete the task, and raises the issue with the
<br />City before the overall task-order budget is affected, rather than reporting an overrun after it has
<br />occurred.
<br /> »Developing construction cost estimates. Opinions of Probable Construction Cost (OPCC) are
<br />developed at a level of detail appropriate to each design phase. Estimates are built from quantity
<br />takeoffs against the evolving plans and priced using recent local bid tabulations, published
<br />unit-cost data, and vendor quotations for major or long-lead items, with explicit line items for
<br />mobilization, maintenance of traffic, utility work, permitting, escalation, and a contingency scaled
<br />to the maturity of the design.
<br /> »How often estimates are updated, and the accuracy that is targeted. Estimates are updated
<br />at the 30%, 60%, 90%, and 100% milestones. Ross prepares estimates on the industry-standard
<br />principle that estimate accuracy tightens as design advances: an early conceptual estimate carries
<br />a wider expected range and a larger contingency, and each successive milestone narrows both as
<br />scope, quantities, and site conditions become better defined. At every update, material changes
<br />from the prior estimate are identified and explained to the City so there are no surprises between
<br />milestones. These estimate-to-bid and bid-to-final comparisons are documented and used to
<br />sharpen future estimates. For Sunny Isles Beach task orders, Ross will report the achieved estimate-
<br />to-award and award-to-final variance to the City as bid
<br />and final-cost information becomes available, giving the
<br />City a documented, project-specific record of accuracy
<br />rather than an unsupported figure.
<br />• Value engineering. Ross treats value engineering as a
<br />continuous part of planning and design, not an end-stage
<br />cost-cutting exercise, and never at the expense of safety,
<br />code compliance, durability, or required performance.
<br />The most reliable savings come from reusing sound
<br />existing infrastructure, avoiding relocations, simplifying
<br />construction, easing long-term maintenance, and
<br />")
<br />")
<br />")
<br />")
<br />")")
<br />")
<br />")
<br />")
<br />")
<br />")
<br />")
<br />")
<br />")
<br />")
<br />")
<br />")")
<br />")
<br />")
<br />")
<br />")
<br />!(!(
<br />!(!(!(!(
<br />!(!(!(!(
<br />!(
<br />!(
<br />!(
<br />!(!(
<br />!(!(
<br />!(!(
<br />!(
<br />!(!(!(!(
<br />!(!(
<br />!(!(
<br />!(!(
<br />!(!(
<br />!(!(
<br />!(
<br />!(!(
<br />!(!(!(!(
<br />!(!(!(!(
<br />!(!(!(!(
<br />!(
<br />!(!(
<br />!(!(
<br />!(!(
<br />!(!(
<br />!(!(
<br />!(!(
<br />!(!(!(!(
<br />!(!(
<br />!(!(
<br />!(!(
<br />!(!(
<br />!(!(
<br />!(!(
<br />!(!(
<br />!(!(!(!(
<br />!(!(
<br />!(!(
<br />!(!(
<br />!(!(
<br />!(!(
<br />!(
<br />!(!(
<br />!(!(!(
<br />!(!(
<br />!(
<br />!(!(
<br />!(
<br />!(!(
<br />!(!(
<br />!(
<br />!(
<br />!(!(
<br />!(
<br />!(!(
<br />!(!(
<br />!(!(
<br />!(!(
<br />!(!(
<br />!(!(!(
<br />!(!(
<br />!(!(
<br />!(
<br />!(
<br />!(!(
<br />!(!(
<br />!(!(!(
<br />!(!(!(
<br />!(
<br />!(
<br />!(
<br />!(!(!(
<br />!(
<br />!(!(
<br />!(!(!(!(
<br />!(!(!(!(
<br />!(!(!(!(
<br />!(
<br />!(!(!(
<br />!(!(
<br />Ventnor Ct VentnorGVentnor DrVentn
<br />o
<br />r
<br />
<br />P
<br />SW 32nd AveVentnor DrSW 2nd Ct
<br />SW 34th TerW Hillsboro BlvdW Sthy 810
<br />Ventnor LSW 32nd TerS Powerline Rd
<br />Ventnor B
<br />SW 31St
<br />A
<br />v
<br />e
<br />Qui
<br />e
<br />t
<br />
<br />W
<br />a
<br />t
<br />e
<br />r
<br />s
<br />
<br />P
<br />a
<br />r
<br />k
<br />Ventnor J
<br />Ventnor C
<br />Ventnor KSW 34th AveVentnor Q
<br />Ventnor Dr
<br />SW 3Rd Ct
<br />Ventnor I
<br />Ventnor D
<br />SW 3Rd Ct SW 32nd TerSW 3Rd St
<br />SW 35th AveSW 3Rd St Ventnor CresVentnor Ct
<br />Ventnor RVentnor MW Sthy 810
<br />Ventnor OSW 31St AveSW 30th TerQuiet Waters ParkSW 33Rd AveSW 34th AveW Hillsboro Blvd
<br />SW 33Rd TerQuiet Waters ParkSW 2nd St
<br />SW 1St Ct
<br />S Powerline RdSW 1St St
<br />JCS1_08
<br />JCS1_08-S
<br />JCS1_09JCS1_09-S JCS1_100
<br />JCS1_100-S
<br />JCS1_101JCS1_101-S
<br />JCS1_102
<br />JCS1_103
<br />JCS1_105-S
<br />JCS1_106-S
<br />JCS1_107 JCS1_107-S
<br />JCS1_108
<br />JCS1_108-S
<br />JCS1_109
<br />JCS1_109-S
<br />JCS1_110-S
<br />JCS1_111
<br />JCS1_111-S
<br />JCS1_112JCS1_112-S
<br />JCS1_113JCS1_113-S
<br />JCS1_114
<br />JCS1_114-SJCS1_115 JCS1_115-SJCS1_116
<br />JCS1_116-S
<br />JCS1_117-SJCS1_118-SJCS1_119
<br />JCS1_120
<br />JCS1_120-S
<br />JCS1_121
<br />JCS1_121-S JCS1_122-S
<br />JCS1_124JCS1_124-SJCS1_125 JCS1_125-S
<br />JCS1_126
<br />JCS1_126-S JCS1_127
<br />JCS1_127-S
<br />JCS1_131
<br />JCS1_16
<br />JCS1_16-S
<br />JCS1_17
<br />JCS1_17-S
<br />JCS1_18
<br />JCS1_18-S
<br />JCS1_19
<br />JCS1_19-S
<br />JCS1_22
<br />JCS1_22-S
<br />JCS1_23
<br />JCS1_23-S
<br />JCS1_24
<br />JCS1_24-S JCS1_25
<br />JCS1_25-SJCS1_26
<br />JCS1_26-S
<br />JCS1_27
<br />JCS1_27-S
<br />JCS1_29
<br />JCS1_29-S JCS1_30
<br />JCS1_30-S
<br />JCS1_31
<br />JCS1_31-S JCS1_32
<br />JCS1_32-S
<br />JCS1_33
<br />JCS1_33-S JCS1_34
<br />JCS1_34-S JCS1_35
<br />JCS1_35-S
<br />JCS1_36
<br />JCS1_36-S
<br />JCS1_37
<br />JCS1_37-S
<br />JCS1_38
<br />JCS1_38-S
<br />JCS1_39
<br />JCS1_39-S
<br />JCS1_40
<br />JCS1_40-S
<br />JCS1_41-S
<br />JCS1_42 JCS1_42-S
<br />JCS1_43 JCS1_44
<br />JCS1_44-S
<br />JCS1_45
<br />JCS1_45-S
<br />JCS1_46-S
<br />JCS1_47
<br />JCS1_47-S
<br />JCS1_48-S
<br />JCS1_49 JCS1_49-S
<br />JCS1_50
<br />JCS1_50-S
<br />JCS1_51-S
<br />JCS1_52-S
<br />JCS1_53
<br />JCS1_53-S
<br />JCS1_54-S
<br />JCS1_55
<br />JCS1_55-S
<br />JCS1_56
<br />JCS1_56-SJCS1_57
<br />JCS1_57-S
<br />JCS1_58
<br />JCS1_58-S
<br />JCS1_59
<br />JCS1_59-S
<br />JCS1_60
<br />JCS1_60-S JCS1_61-S
<br />JCS1_62
<br />JCS1_62-S
<br />JCS1_63
<br />JCS1_64-S
<br />JCS1_65-S
<br />JCS1_66
<br />JCS1_66-S
<br />JCS1_67JCS1_67-S
<br />JCS1_68-SJCS1_69
<br />JCS1_69-S
<br />JCS1_78-S JCS1_79
<br />JCS1_79-S
<br />JCS1_80-S
<br />JCS1_82
<br />JCS1_83
<br />JCS1_84
<br />JCS1_84-SJCS1_85
<br />JCS1_86-S
<br />JCS1_87JCS1_87-S
<br />JCS1_88JCS1_88-S
<br />JCS1_89 JCS1_89-S
<br />JCS1_90
<br />JCS1_90-S
<br />JCS1_91
<br />JCS1_92JCS1_92-S
<br />JCS1_93 JCS1_94
<br />JCS1_95
<br />JCS1_96-S
<br />JCS1_97
<br />JCS1_99
<br />JCS1_99-S
<br />Proposed Conditions ModelSchematic Map
<br />Figure
<br />3-2
<br />Sources:Aerial: Broward County, 2019Roads: Broward County ¯0 10050Feet
<br />Legend
<br />Parcels
<br />Subcatchments
<br />!(Junctions
<br />#*Outfalls
<br />")Storages
<br />Conduit
<br />Exfiltration
<br />Gutter Flow
<br />Outlets
<br />Pumps
<br />Weirs
<br />Proposed Force MainOutfall to Canal
<br />Proposed StormwaterPump Station
<br />Proposed Outfallto Canal
<br />West DeerfieldStormwater Capital Improvement Project
|