My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ross Engineering, Inc. Bid Document (19)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
Ross Engineering, Inc
>
Ross Engineering, Inc. Bid Document (19)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 1:41:19 PM
Creation date
8/31/2026 1:40:26 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 <br />City of Sunny Isles Beach | RFQ 26-07-01 <br />Continuing Professional Architectural and Engineering | General Civil Engineer <br />Hydrologic and Hydraulic Modeling <br />• Groundwater Modeling (Modflow, GMS, and 3D <br />Modflow) <br />• Integrated Surface / Groundwater Modeling <br />(Mike-She /Mike 11, XP-SWMM, EFOC/HEM 3D) <br />• Surface Water Modeling (XP-SWMM, ICPR, Mike <br />11, SMS, HEC HMS/HEC-RAS) <br />• Stormwater Master Planning (XP-SWMM) <br />• Water Quality / Ecological Modeling (WAM, <br />WASP, SWMM) <br />• 2D and 3D Modeling (XP-SWMM, HEC, Flow 3D) <br />Civil Engineering <br />• Drainage Design and Permitting <br />• Traffic Design and FDOT and / or County Permitting <br />• Land Development for Residential, Commercial, <br />Industrial, Educational and Agricultural Uses <br />• Retrofits to Existing Properties <br />• Utility Design and Permitting <br />• Public Works Design (Roadway, Drainage, Utilities, <br />Traffic, etc.) <br />• Environmental Resource Permitting (Stormwater, <br />Wetlands, Endangered Species, etc.) <br />• Stormwater Pollution Prevention Plans <br />Inspections <br />• Construction Inspection Admin Services <br />• 5 Year Operation and Maintenance Drainage <br />Recertification <br />• NPDES Stormwater Inspections / Permitting <br />Water Use Permitting <br />• Irrigation Design and Permitting <br />• Well Design and Permitting <br />Utility Engineering <br />• Sanitary Lift Station and Stormwater Pump <br />Station Design and Permitting <br />• Septic Design and HRS Permitting <br />• Water Distribution System Design and Permitting <br />• Utility Crossing and Utility Extension Design and <br />Permitting <br />Water Resources Engineering <br />• Canal Design & Permitting <br />• Reservoir / Impoundment Design & Permitting <br />• STA Design & Permitting <br />• Control Structure Design & Permitting <br />• Levee Design; Seepage Analysis & Permitting <br />Expert Witness <br />• Drainage / Stormwater <br />• Utilities <br />• Transportation <br />• Environmental <br />Transportation and Traffic Engineering <br />• RRR Projects <br />• Reconstruction Projects <br />• Interchange Projects <br />• Bridge and Culvert Scour Projects <br />• Design-Build Projects <br />• Turn Lane, Driveway, Sidewalk, and Median <br />Projects <br />• Utility Extension, Relocation and Canal Crossing <br />Projects <br />• Drainage Connection, Driveway Connection, <br />Utility and ROW Permitting Projects
The URL can be used to link to this page
Your browser does not support the video tag.