Laserfiche WebLink
RFQ # 26-07-01 CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) <br />DISCIPLINE CATEGORY #4. ELECTRICAL ENGINEERS <br />9 <br />Client <br />City of Fort Lauderdale <br />Danica Grujicic <br />290 NE 3rd Avenue, <br />Fort Lauderdale, FL <br />33301 <br />954-828-5055 <br />DGrujicic@ <br />fortlauderdale.gov <br />Project Cost <br />Varies Per Project; Listed <br />on Right <br />Completion Dates <br />Varies Per Project; Listed <br />on Right <br />Key Project Elements <br />Continuing Contract <br />Municipal Facilities <br />Electrical Upgrades <br />Manual Transfer Switch <br />Underground Feeders <br />Electrical Distribution <br />SGM Engineering has served as the Mechanical, Electrical and Plumbing Engineer <br />as prime under a continuing contract with the City of Fort Lauderdale since 2015, <br />completing projects such as: <br />Public Works Administration EOC Building HVAC Renovation <br />Cost: $1.9M Completion Date: Aug. 2024 <br />Description: SGM provided full demolition drawings for existing air cooled chillers, <br />pumps, expansion tanks, and associated controls and a new air cooled chiller with variable <br />primary chilled water pumping. We also provided associated controls, ET, AS as required <br />with new CEP and new makeup water assembly and connect to existing domestic as <br />required. SGM also provided full demolition drawings for all HVAC systems including <br />rooftop units, indoor AHUs, ductwork, VAV, diffusers, ect. All associated HVAC systems <br />shall be removed. We provided new chilled water AHUs with VAV boxes with reheat <br />and locating AHUs indoors as possible and consolidating/reducing the AHU count as <br />possible to assist in maintenance. All new HVAC controls were provided with this project <br />and electrical panels were updated as required as well as associated conduit that has <br />exceeded life expectancy. SGM provided new exhaust systems as required for general <br />bathrooms and 3rd floor labs, as well as conditioned makeup air for 3rd floor. The entire <br />building was currently backed up on emergency generator. Design shall ensured the <br />building remained fully backed up on emergency generator. We provided demolition <br />drawings as required for the removal of all hydronic piping associated in the space and <br />redundancy for future capacity identified on ground floor. As an option, we are exploring <br />the possibility of locating AHUs on the ground floor in lieu of rooftop units currently <br />installed. We also provided roofing details to accommodate re-roofing scope of existing <br />rooftop units being removed. <br />PRIME CONSULTANT <br />CITY OF FORT LAUDERDALE CONTINUING PROFESSIONAL <br />SERVICES CONTRACTS <br /> Fort Lauderdale, FL <br />MQR #2PROJECT EXAMPLE #1