RFQ # 26-07-01 CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA)
<br />DISCIPLINE CATEGORY #4. ELECTRICAL ENGINEERS
<br />25
<br />Available
<br />Service
<br />SGM’s Understanding of the
<br />Issues and Tasks
<br />Typical Services and
<br />Deliverables
<br />Permitting support
<br />Permit requirements and review
<br />durations can affect both design
<br />and construction schedules.
<br />Permit-ready documents, pre-
<br />submittal coordination, application
<br />support, comment tracking,
<br />response preparation, revised
<br />documents, and approval follow-
<br />through.
<br />Bidding and negotiation
<br />support
<br />Clear responses and controlled
<br />addenda are essential to obtaining
<br />comparable bids and avoiding
<br />unintended scope changes.
<br />Pre-bid meeting support, responses
<br />to bidder questions, technical
<br />addenda, bid-scope review,
<br />bid evaluation, and award
<br />recommendations as authorized.
<br />Construction
<br />administration and on-site
<br />representation
<br />Construction must be monitored
<br />for consistency with the design
<br />while maintaining City control
<br />over scope, cost, schedule, and
<br />operational decisions.
<br />Meetings, site observations,
<br />RFIs, submittals, pay-application
<br />recommendations, substitution
<br />review, change evaluation,
<br />deficiency tracking, testing
<br />coordination, and field reports.
<br />Testing, commissioning,
<br />and training
<br />Equipment must operate as
<br />an integrated system and City
<br />personnel must receive the
<br />information necessary to operate
<br />and maintain it.
<br />Prefunctional checklists, startup
<br />verification, functional testing,
<br />deficiency tracking, operator
<br />training coordination, commissioning
<br />reports, and acceptance
<br />documentation.
<br />Closeout and record
<br />documentation
<br />Closeout requires more than
<br />punch-list completion and must
<br />provide a usable operational
<br />record for the City.
<br />Permit closeout, final inspections,
<br />testing records, commissioning
<br />reports, training records, operation
<br />and maintenance manuals,
<br />warranties, record drawings,
<br />corrected electronic files, and
<br />closeout matrix.
<br />Miscellaneous and urgent
<br />assignments
<br />Continuing-service needs can arise
<br />with limited notice and may involve
<br />investigations, failures, outages,
<br />public concerns, or time-sensitive
<br />operational decisions.
<br />Rapid technical consultation, field
<br />evaluation, written findings, repair
<br />recommendations, emergency
<br />design support, cost and schedule
<br />evaluation, and other services
<br />requested by the City Manager.
<br />SGM understands that each task order will have a different critical constraint. For one assignment,
<br />the controlling issue may be utility lead time; for another, it may be an outage window, a public
<br />event, coastal exposure, permit review, equipment procurement, or the need to keep a facility
<br />fully operational. SGM will identify the controlling constraints during scoping and incorporate
<br />them into the task-order work plan before design begins.
<br />2. QUALIFICATIONS
|