Laserfiche WebLink
RFQ # 26-07-01 CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) <br />DISCIPLINE CATEGORY #4. ELECTRICAL ENGINEERS <br />24 <br />Available <br />Service <br />SGM’s Understanding of the <br />Issues and Tasks <br />Typical Services and <br />Deliverables <br />Street, site, park, and <br />public-space lighting <br />Lighting must balance public <br />safety, visibility, energy use, <br />maintenance, CPTED principles, <br />glare, spill light, light pollution, <br />camera coverage, utilities, and <br />nearby properties. <br />Photometric calculations, fixture <br />and pole selection, lighting controls, <br />pole and foundation coordination, <br />underground routing, utility <br />coordination, and construction <br />documents. <br />Sports-field lighting <br />Sports facilities require coordinated <br />illumination, glare control, pole and <br />foundation design, underground <br />electrical service, controls, support <br />power, procurement planning, and <br />coordination with scheduled public <br />use. <br />Photometrics, lighting layouts, pole <br />and foundation coordination, <br />electrical distribution, lighting <br />controls, scoreboard and support <br />power, utility coordination, and bid <br />documents. <br />Fire-alarm and life-safety <br />systems <br />Renovations and equipment <br />replacements may affect <br />detection, notification, emergency <br />interfaces, smoke control, <br />elevators, and other life-safety <br />functions. <br />Fire-alarm assessments, device <br />layouts, risers, sequence-of- <br />operation requirements, interface <br />coordination, calculations, <br />specifications, testing, and <br />acceptance requirements. <br />Communications, security, <br />and technology systems <br />The City may require systems <br />compatible with its existing IT, <br />fiber, CCTV, controlled-access, <br />communications, and security <br />platforms. <br />Pathway and cabling design, <br />power requirements, equipment- <br />room coordination, CCTV, access <br />control, communications, network <br />infrastructure, audiovisual interfaces, <br />and system integration. <br />Coastal and severe- <br />weather resilience <br />Salt air, humidity, wind, flooding, <br />and storm-related outages can <br />reduce equipment life and affect <br />system reliability. <br />Corrosion-resistant materials and <br />enclosures, equipment elevation <br />and placement, wind-rated <br />assemblies, protected pathways, <br />redundancy, weatherproofing, <br />emergency power, and <br />maintainability review. <br />Technical specifications <br />and construction <br />documents <br />Drawings, specifications, <br />calculations, schedules, and bid <br />forms must provide a complete, <br />coordinated, permit-ready, and <br />constructible package. <br />Design drawings, calculations, <br />technical specifications, details, <br />schedules, bid quantities, phasing <br />requirements, testing criteria, <br />commissioning requirements, and <br />signed and sealed documents. <br />Cost estimating and value <br />evaluation <br />The City requires early visibility into <br />probable construction cost and the <br />effect of alternatives, escalation, <br />phasing, and operational <br />constraints. <br />Preliminary and milestone <br />estimates, quantity takeoffs, <br />estimate reconciliation, life-cycle <br />comparisons, value options, <br />alternates, allowances, and budget- <br />recovery recommendations. <br />Three-dimensional <br />renderings and electronic <br />deliverables <br />The RFQ requires project renderings <br />and electronic data compatible <br />with the City’s three-dimensional <br />database. <br />Task-appropriate three-dimensional <br />renderings, coordinated electronic <br />files, hard-copy exhibits, CADD <br />files, record documents, and City- <br />compatible data formats. <br />2. QUALIFICATIONS