My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SGM Engineering, Inc. Bid Document (1)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
SGM Engineering, Inc
>
SGM Engineering, Inc. Bid Document (1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 1:42:48 PM
Creation date
8/31/2026 1:41:59 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RFQ # 26-07-01 CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) <br />DISCIPLINE CATEGORY #4. ELECTRICAL ENGINEERS <br />30 <br />MQR #2 <br />Client <br />Florida International <br />University <br />Danny Paan <br />11200 S.W. 8th Street <br />CSC 237, Miami, FL <br />33199 <br />305-348-4005 <br />paand@fiu.edu <br />Project Cost <br />Varies Per Project; Listed <br />on Right <br />Completion Dates <br />Varies Per Project; Listed <br />on Right <br />Key Project Elements <br />Continuing Services <br />Campus Infrastructure <br />HVAC Replacement <br />Rooftop Units <br />Load Calculations <br />Energy Code <br />Since 2016, SGM has provided Mechanical, Electrical, and Plumbing services for multiple <br />projects at Florida International University under the continuing services contract, <br />including HVAC replacements, elevator upgrades, water booster pump systems, building <br />modifications, and electrical upgrades at key facilities like Panther Arena, University Park <br />Towers, SIPA, CASE, and the FIU Football Stadium. <br />FIU MMC Panther Arena FM 220632 New A/C Units Above Fieldhouse <br />Cost: $175,000 Completion Date: March 2024 <br />Description: SGM provided MEP and structural design services for the replacement of <br />three existing packaged rooftop units: a Trane unit, a Carrier unit (RTU 1-2, electrically <br />fed from HF3A), and an AAON unit (RTU 1-2, also fed from HF3A). The scope involved <br />performing load calculations in accordance with the Florida Building Code – Energy Code, <br />ventilation calculations per ASHRAE 62.1, and required energy calculations. Structural <br />design included uplift calculations to support the new units, ensuring compatibility with <br />the existing roof openings. The scope also included control drawings and construction <br />administration services as needed. <br />FIU MMC University Park Towers – Domestic Water Booster Pump Replacement <br />Cost: $75,000 Completion Date: Feb. 2024 <br />Description: SGM provided MEP engineering services for the University Park Towers <br />domestic water booster pump replacement. The scope included the demolition and <br />removal of the existing domestic water booster pumps and associated components, <br />followed by the installation of a new prepackaged domestic water booster skid with all <br />necessary controls. Construction administration services were be provided as required. <br />PRIME CONSULTANT <br />FLORIDA INTERNATIONAL UNIVERSITY CONTINUING <br />SERVICES CONTRACT <br />Miami, FL <br />ADDITIONAL PROJECT EXAMPLE #4
The URL can be used to link to this page
Your browser does not support the video tag.