My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SGM Engineering, Inc. Bid Document (1)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
SGM Engineering, Inc
>
SGM Engineering, Inc. Bid Document (1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 1:42:48 PM
Creation date
8/31/2026 1:41:59 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RFQ # 26-07-01 CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) <br />DISCIPLINE CATEGORY #4. ELECTRICAL ENGINEERS <br />31 <br />FIU MMC BT-887 SIPA II - 2nd Floor Modification into SIPA I <br />Cost: $225,000 Completion Date: Sept. 2024 <br />SGM provided engineering and architectural services for modifying the second floor of the SIPA I building to <br />improve connectivity with the SIPA II building at the Modesto Maidique Campus in Miami, Florida. The scope <br />included architectural design for wall, door, and ceiling modifications to establish a clear pathway between the <br />buildings. Engineering services addressed the relocation and adjustment of existing wall- and ceiling-mounted <br />devices to accommodate the new layout. Additionally, the project included the preparation of book specifications, <br />submittal reviews during construction, and two 2-hour site visits to ensure substantial conformance. <br />FIU MMC CP Building Elevator #1 and #2 Upgrade <br />Cost: $425,000 Completion Date: Sept. 2024 <br />SGM provided mechanical and electrical engineering services for the elevator upgrades in the CP Building. SGM <br />attended a site visit to assess the existing mechanical and electrical service conditions for the elevator machine room. <br />The scope involved creating demolition drawings, designing and specifying the modernization of the elevator, and <br />reviewing Florida Code requirements for elevator landing lighting levels. Fire alarm provisions were addressed as <br />needed, and the existing electrical service capacities were verified to support the new equipment. Construction <br />administration services included responding to RFIs, reviewing drawing submittals, and evaluating contractor pay <br />requests. <br />FIU CASE Building Elevator Upgrade <br />Cost: $250,000 Completion Date: Sept. 2024 <br />SGM provided MEP engineering and construction administration services for the elevator upgrades in the CASE <br />Building. We conducted a site visit to verify the existing mechanical and electrical conditions of the elevator machine <br />room. We then prepared demolition drawings and designs and specification for the elevator modernization. The <br />project included a review of elevator landing lighting requirements per Florida Code, fire alarm provisions as needed, <br />and verification of existing electrical service capacity to ensure it supports the new equipment. <br />FIU Football Stadium Locker Room Upgrades <br />Cost: $125,000 Completion Date: July 2023 <br />SGM provided electrical engineering services for the addition of electrical connections for new lockers being <br />replaced in the Football team Locker Room of the Ricardo Silva Football Stadium building located at the Modesto <br />Maidique Campus in Miami, Florida. <br />MQR #2 <br />PRIME CONSULTANT <br />FLORIDA INTERNATIONAL UNIVERSITY CONTINUING <br />SERVICES CONTRACT (PAGE 2) <br />Miami, FL <br />ADDITIONAL PROJECT EXAMPLE #4
The URL can be used to link to this page
Your browser does not support the video tag.