RFQ # 26-07-01 CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) <br />DISCIPLINE CATEGORY #4. ELECTRICAL ENGINEERS <br />47 <br />4. APPROACH / METHODOLOGY <br />4.1 A Suitable Approach for Sunny Isles Beach <br />SGM will tailor the level of effort to each assignment while applying the same controls every time. Work <br />will begin only after the City's written authorization or Notice to Proceed. At kickoff, SGM will convert the <br />task request into a confirmed scope, responsibility matrix, deliverable list, schedule, budget basis, decision <br />calendar, risk register, and communication plan. This establishes the definition of done before production <br />starts. <br />1. Electrical first, fully coordinated. Power, lighting, emergency power, fire alarm, communications, <br />and technology systems are led as one coordinated electrical package; SGM's in-house MEP/FP and <br />commissioning resources resolve interfaces before they become field conflicts. <br />2. Existing conditions before assumptions. Record drawings are a starting point, not a substitute for field <br />verification. SGM documents service capacity, equipment condition, routing, clearances, operational <br />constraints, and utility/AHJ requirements before selecting a solution. <br />3. Decision-ready design. Every milestone identifies what changed, what remains open, the cost and <br />schedule effect, the party responsible, and the date a City decision is needed. <br />4. Operations-centered constructability. Designs account for outages, temporary power, phasing, public <br />access, maintainability, coastal exposure, hurricane resilience, long-lead equipment, and safe work in <br />occupied facilities. <br />5. Open-platform technology coordination. IT fiber, access control, CCTV, security, and AV systems are <br />coordinated with the City's existing platforms and standards so devices, pathways, power, networks, and <br />responsibilities are complete and compatible. <br />6. Complete digital handoff. SGM will provide coordinated electronic deliverables, record drawings, and <br />task-appropriate 3-D renderings in the format established with the City for use in its 3-D database. <br />4.2 Five-Phase Task-Order Methodology <br />7. Mobilize and define. Acknowledge the request, identify the City's success criteria and stakeholders, <br />review available records, confirm the limits of service, define submittals and acceptance criteria, identify <br />permits/utilities, and develop the initial work breakdown structure. Output: confirmed scope, responsibility <br />matrix, baseline schedule, decision log, risk register, and field-investigation plan. <br />8. Study and report. Perform field investigation and the analyses appropriate to the assignment, such as load <br />and capacity studies, condition assessments, photometrics, short-circuit/coordination/arc-flash studies, <br />emergency-power evaluations, code review, technology-platform review, and life-cycle comparison of <br />alternatives. Output: findings, recommended solution, preliminary cost, schedule implications, and City <br />approval to proceed. <br />9. Preliminary and final design. Advance the City-approved solution through 30, 60, 90, and 100 percent <br />reviews. Update calculations, drawings, technical specifications, bid sheets, 3-D renderings when <br />required, cost estimate, schedule, risk log, and comment matrix at each gate. Coordinate power, lighting, <br />generators/ATS, fire alarm, IT/fiber, security, controlled access, CCTV, AV, MEP/FP, civil/site, architectural, <br />structural, and utility interfaces applicable to the task. <br />10. Permit, bid, and negotiate. Complete an agency pre-check, prepare permit support documents, track <br />City and Miami-Dade comments to closure, respond to technical questions, and incorporate required <br />revisions. Support pre-bid meetings, minutes, addenda through the City's Purchasing Administrator, bidder <br />questions, bid evaluation, and award recommendation as authorized. <br />11. Administer construction and close out. Attend required meetings and site observations; review RFIs, <br />submittals, pay applications, substitutions, and change requests; document nonconforming work; and <br />maintain the decision/change log. SGM will not authorize a cost, scope, or time change without the