Laserfiche WebLink
RFQ # 26-07-01 CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) <br />DISCIPLINE CATEGORY #4. ELECTRICAL ENGINEERS <br />48 <br />City's prior written approval. Closeout includes testing/commissioning as applicable, punch lists, O&M <br />and warranty review, record drawings, corrected CADD files, and lessons learned. <br />SCALABLE BY DESIGN <br />A small consultation may use the same controls in a concise form; a complex capital project uses the full <br />set. The method is proportional, but accountability never changes. <br />4.3 Overall Organization and Accountability <br />The City's Project Manager will have one primary point of contact with authority to coordinate SGM's <br />complete response. Technical production, quality review, and executive escalation are separated so <br />responsibilities remain clear and no individual is asked to approve his or her own work. <br />12. City direction enters once. Justin receives and confirms direction from the City's Project Manager, <br />records it in the decision/action log, and assigns it to the responsible lead. <br />13. Quality review is independent. Mark reviews milestone deliverables but does not replace the producer's <br />self-check or the EOR's professional responsibility. <br />14. The City retains decision authority. SGM will not treat informal field discussions as authorization for <br />scope, cost, or schedule changes. Decision items are documented for the City's Project Manager. <br />NAMED ACCOUNTABILITY STRUCTURE <br />Principal-in-Charge / Contract Executive - Bobby Shahnami, PE, CxA, LEED AP BD+C <br />Executive commitment, resource authority, contract continuity, and escalation for unresolved service or <br />complaint issues. <br />Project Manager / Electrical & Technology Lead - Justin Mundell, PE, RCDD <br />Single point of contact; scope, schedule, budget, communication, coordination, risk, and final delivery <br />accountability. <br />Deputy PM / Local Electrical Lead / EOR - Manuel Hernandez, PE <br /> Miami-area response, field and AHJ coordination, technical leadership, code compliance, and signed/ <br />sealed electrical deliverables. <br />Independent QA/QC Lead - Mark Escott, PE, CxA, LEED AP <br /> Independent review of power, emergency systems, lighting, technology, constructability, interdisciplinary <br />coordination, and comment closure. <br />Electrical / Low-Voltage Production & Constructability - Craig Thompson, PE; Jeremy Neely <br /> Calculations, design production, cost input, existing-condition validation, power/lighting/fire alarm/ <br />telecom/security coordination, and CA support. <br />Field / CA / Commissioning - Scott Gillen; Nassi Rahbari, CxA <br /> Site observations, submittal/RFI support, testing and commissioning coordination, punch list, closeout, and <br />record-document verification. <br />HOW WORK MOVES THROUGH THE ORGANIZATION <br />15. Technical work has a named owner. Each work-package owner is responsible for scope, interfaces, <br />due dates, and completion evidence; Manuel resolves local/AHJ matters and acts when the PM is <br />unavailable. <br />16. Resources scale without changing accountability. Justin conducts a weekly workload review across <br />active task orders, pulls from SGM's in-house technical bench when needed, and maintains the named <br />team. Any proposed personnel substitution will be submitted for City approval. <br />4.4 Ability to Meet Desired Timelines and Deadlines <br />SGM treats the task-order completion date as a controlled outcome, not a date placed at the end of