RFQ # 26-07-01 CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) <br />DISCIPLINE CATEGORY #4. ELECTRICAL ENGINEERS <br />53 <br />ELECTRICAL AND TECHNOLOGY REVIEW CHECKS <br />27. Existing and new load, service capacity, voltage drop, short-circuit, coordination/selective coordination, <br />arc-flash, grounding, and code calculations as applicable. <br />28. One-line diagrams, panel schedules, equipment ratings, generator/ATS operation, emergency/life- <br />safety separation, and utility interfaces. <br />29. Lighting levels, controls, photometrics, energy-code compliance, pole/foundation coordination, and <br />maintainability for street, site, and sports-field lighting. <br />30. Fire alarm, IT/fiber, telecom pathways, access control, CCTV, security, and AV power/data/interface <br />requirements coordinated with City platforms. <br />31. Drawing, specification, bid-form, equipment-tag, quantity, phasing, and demolition/new-work <br />consistency. <br />32. Permit/AHJ requirements, accessibility and public-safety impacts, temporary power, shutdown <br />sequencing, commissioning/testing, and record-document requirements. <br />All review comments are recorded in a comment-resolution matrix with an owner, due date, disposition, <br />and verification. A comment is not closed merely because text was added; the reviewer verifies the <br />correction in the revised deliverable. <br />4.9 Complaint Handling and City Project Manager Notification <br />SGM defines a complaint broadly: any concern regarding responsiveness, staff conduct, design quality, <br />safety, security, public or facility impacts, schedule, cost, construction administration, or failure to meet <br />an agreed expectation. Complaints may arrive by phone, email, meeting, field observation, contractor, <br />stakeholder, or City staff. Every complaint is documented and brought to the City's Project Manager; <br />none remains only at the technical-team level. <br />33. Receive and acknowledge. The recipient acknowledges the concern respectfully, captures the facts <br />without assigning blame, and immediately forwards it to Justin Mundell. If the complaint concerns Justin, <br />it goes directly to Bobby Shahnami with the City's Project Manager copied/notified. <br />34.og and classify. SGM opens an item in the complaint/issue log with the task order, date/time, source, <br />description, location, potential impact, severity, action owner, and required notification/closure dates. <br />35. Protect people and operations. For a potential safety, security, outage, code, environmental, or critical <br />public-impact issue, SGM takes authorized immediate containment action and notifies the City's Project <br />Manager at once. SGM does not make unauthorized commitments to third parties. <br />Review Gate Primary Review Focus Release Criterion Completion <br />90%Constructability, maintainability, phasing and outages, specifications, bid quantities, permit readiness, commissioning requirements, detailed cost, schedule, and independent QA/QC. <br />Bid-ready package; QA/QC and City comments assigned and resolved. <br />2021 planned / 2021 actual <br />100%Final comment closure; consistency among calculations, drawings, schedules, and specifications; signatures and seals; permit and bid completeness; commissioning requirements; and digital deliverables. <br />Signed QA/QC release and Engineer of Record authorization; no unresolved critical comments.