Laserfiche WebLink
2. QUALIFICATIONS <br />43SRS Engineering, Inc.• RFQ No. 26-07-01 <br />2. QUALIFICATIONS _______________ <br /> „Corrosion and material life. Salt air and brackish groundwater shorten the life of standard materials. <br />Specification choices for structures, hardware, coatings and pipe materials materially affect the City’s <br />maintenance cost. <br /> „Layered permitting with long review cycles. RER/DERM, FDOT, SFWMD, FDEP and ACOE reviews are on the <br />critical path more often than design is. Pre-application coordination is the single highest-leverage schedule <br />control available. <br /> „Resiliency and grant funding. Federal and state resilience funding carries documentation, reporting and <br />eligibility requirements. Getting that right at scoping avoids reimbursement problems later. <br />PROJECT LIST — RELEVANT EXPERIENCE IN MIAMI-DADE, BROWARD AND PALM BEACH COUNTIES <br />All projects listed below are located in Miami-Dade County, Florida. Each entry gives the owner and the owner’s <br />representative familiar with the work <br />PROJECT OWNER Status SRS Role Owner’s <br />Representative <br />Cutler Ridge Pines Drainage and <br />Roadway Improvements ($2.5M ARPA, <br />approx. 6,295 LF) — APWA Consultant <br />of the Year, Stormwater <br />Town of Cutler Bay, <br />10720 Caribbean Blvd., <br />Cutler Bay, FL 33189 <br />Complete Prime; Engineer of <br />Record and CEI <br />Alfredo Quintero, Public <br />Works Director, (786) <br />573-5520 <br />Saga Bay 1.5 South Roadway and <br />Drainage Improvements — delivered on <br />schedule and under budget (2024) <br />Town of Cutler Bay Complete Prime; Engineer of <br />Record <br />Alfredo Quintero, (786) <br />573-5520 <br />B-50904 NW 7th Street Road Drainage <br />Improvements, NW 9th Court to NW <br />North River Drive — outfall to Seybold <br />Canal, upsized conveyance, curb and <br />gutter, sidewalk back raising, milling and <br />resurfacing <br />City of Miami, 444 SW <br />2nd Avenue, Miami, FL <br />33130 <br />Construction <br />completed <br />1/2025 <br />Civil Engineer of <br />Record <br />Juvenal Santana, Jr., P.E., <br />CFM, (305) 416-1200 <br />Citywide Sanitary Sewer Master Plan <br />— 12 subarea plans, approx. $46.8M of <br />identified improvements <br />City of South Miami, <br />6130 Sunset Drive, <br />South Miami, FL 33143 <br />Complete Prime; Civil Engineer <br />Alex Muñoz, Director <br />of Public Works & CIP, <br />(305) 403-2078 <br />Ojus Sanitary Sewer Improvements — 1 <br />new pump station, approx. 9,915 LF <br />gravity sewer, 98 new laterals; part of <br />pump station and pipeline upgrades at <br />50+ stations <br />Miami-Dade Water and <br />Sewer Department <br />Permitted and <br />delivered for <br />construction <br />Prime; Civil Engineer of <br />Record <br />Juan Curiel, P.E., (786) <br />552-8399 <br />NW 58th Street Reconstruction, <br />SR-836 to NW 97th Avenue — 4-lane <br />section with center turn lane, drainage, <br />signalization and lighting <br />Miami-Dade County <br />Department of <br />Transportation and <br />Public Works <br />Complete Prime; Civil Engineer of <br />Record <br />Fernando Mardones, <br />(305) 375-4455 <br />NW 142nd Street Water and Sewer <br />Improvements ($2.495M construction), <br />permitted through DERM and Health <br />City of Hialeah, 501 <br />Palm Avenue, Hialeah, <br />FL 33010 <br />Completed <br />2019 <br />Prime; Engineer of <br />Record <br />Jose Sanchez, Street <br />Department Director, <br />(305) 687-2611 <br />E 10th–12th Avenue from E 49th– <br />52nd Street Roadway and Drainage <br />Improvements — preliminary <br />contamination study and conceptual <br />drainage with DERM pre-approval <br />before full design (2025) <br />City of Hialeah Complete Prime; Engineer of <br />Record <br />Jose Sanchez, (305) <br />687-2611