Laserfiche WebLink
3. STAFFING <br />58SRS Engineering, Inc.• RFQ No. 26-07-01 <br />3. STAFFING _______________ <br />Years of <br />Experience <br />10 years <br />Years at SRS <br />8 years <br />Education <br />B.S. Civil <br />Engineering, New <br />Jersey Institute of <br />Technology, <br />Newark, NJ <br />Professional <br />Registrations, <br />Certifications, and <br />Memberships <br />Professional <br />Engineer <br />License No. <br />100668 <br />Oliden Martinez, P.E. <br />Project Manager <br />Mr. Oliden Martinez, P.E., has been an experienced Project Manager and has <br />cultivated his skills and abilities in managing the civil engineering plans and <br />designs for projects in both the Public and Private sectors. Mr. Martinez has executed <br />the management of pump stations, reservoirs, storm drainage systems, water <br />mains, site development, and storm drainage systems <br />Relevant Experience <br />West Dixie Highway | Project Manager <br />This project involved the reconstruction of approximately ¾ mile of West Dixie <br />Highway in Miami-Dade County, from NE 163rd Street to NE 173rd Street. <br />Improvements included a new 4-lane roadway, upgraded drainage, three signalized <br />intersections, enhanced lighting, pavement markings and signage, and a new 4-lane <br />concrete bridge replacing aging infrastructure in compliance with FDOT and county <br />standards. The scope also included ADA-compliant sidewalks and ramps, utility <br />relocation, and coordination with adjacent properties and agencies, supported by <br />multidisciplinary design efforts such as geometric layout, hydraulic analysis, structural <br />engineering, and preparation of construction documents. <br />NE 2nd Ave from NE 20th ST to NE 36th ST | Project Manager <br />Oliden Martinez led the NE 2nd Avenue Improvements project for the City of Miami, <br />managing the Design-Build Criteria Package, including preliminary design, scoping, <br />and stakeholder coordination. He was responsible for drainage design, roadway <br />layout, ADA compliance, pavement markings, and signage, while leading field <br />investigations and multidisciplinary coordination. He also oversaw key deliverables <br />such as cost estimates, CAD plans, and bid-phase support. <br />NW 58th ST from NW 97 Ave to NW 79 Ave Roadway Improvements | Project <br />Manager <br />The scope of services included comprehensive engineering design and post-design <br />activities to deliver construction documents for a major roadway reconstruction project, <br />transforming a two-mile corridor into a modern 4-lane roadway with a center turn lane. <br />Oliden Martinez led the drainage design, including system layout and calculations, as <br />well as pavement markings and signage, ensuring compliance with all standards. The <br />project also incorporated multimodal enhancements such as bike lanes, ADA- <br />compliant sidewalks, drainage improvements, traffic signal upgrades, lighting, <br />environmental permitting, and construction administration services to support <br />successful project delivery. <br />Saga Bay (South) Roadway & Drainage Improvements | Design Engineer <br />The scope of work for this project was to provide engineering design, preparation of <br />construction documents, plans processing and permitting (Town of Cutler Bay, Miami- <br />Dade County Public Works, and Miami-Dade County DERM, and provide limited <br />construction phase support services to the Town of Cutler Bay for the construction of <br />roadway and drainage improvement for the Saga Bay 1.5 – South Sub-Basin (SW 83rd <br />Ave, SW 82nd Ct., SW 84th Ave, SW 204th St., SW 205th Ter., and SW 206 Ter.). <br />Martinez helped with the design of roadway reconstruction, drainage improvements, <br />pavement markings and signage, and sidewalks and ADA upgrades.