Laserfiche WebLink
4. APPROACH/METHODOLOGY <br />60SRS Engineering, Inc.• RFQ No. 26-07-01 <br />4. APPROACH/METHODOLOGY _______________ <br />OVERALL APPROACH <br />SRS will approach this contract as an extension of City staff. Each assignment will begin with a clear understanding <br />of the City’s objectives, constraints, stakeholders, available budget and expected schedule. We will confirm <br />scope, data needs, deliverables and review milestones before beginning design or technical work. For on-call <br />assignments this early project definition is critical, because many tasks must move quickly while still maintaining <br />quality, permitting compliance and proper documentation. <br />Our philosophy is to produce designs that are feasible, economical, functional and readily constructible. We <br />evaluate existing conditions, utility conflicts, drainage performance, tidal and groundwater influence, access, <br />right-of-way constraints, regulatory requirements, maintenance needs and public impacts early in the process, <br />so that design issues are resolved before they become construction issues. <br />OVERALL ORGANIZATION TO COMPLETING THE WORK <br />SRS will manage the work as prime consultant and will be responsible for coordinating all sub-consultants, <br />specialty disciplines and deliverables. Roles are fixed for the term of the contract: <br /> „PRINCIPAL-IN-CHARGE: Contract oversight, client satisfaction, dispute resolution and final QA review. <br /> „ASSIGNED PROJECT MANAGER: Day-to-day management, scope control, schedule, budget, sub- <br />consultants, deliverables and reporting; the City’s single point of contact. <br /> „PROJECT ENGINEERS AND DESIGNERS: Technical analysis, design calculations, plans, specifications, <br />permitting responses and cost estimates. <br /> „SURVEY GROUP: Boundary and topographic survey, control, elevation certificates, and as-built survey. <br /> „CONSTRUCTION MANAGERS AND INSPECTORS: Field observation, documentation, pay application <br />input, change order support and closeout assistance. <br /> „SUB-CONSULTANTS: Traffic, structural, MEP, landscape, geotechnical, environmental and other specialty <br />disciplines as needed. <br />WORK PLAN — TASK ORDER METHODOLOGY <br />STEP 1: ASSIGNMENT INTAKE AND SCOPE CONFIRMATION: Upon receiving a request from the City, the <br />Principal and/or Project Manager meets with City staff to confirm the objective, background information, <br />available studies or record drawings, regulatory constraints, stakeholder concerns, anticipated deliverables, <br />desired schedule and budget expectations. SRS then prepares a written work order scope (proposal) identifying <br />tasks, meetings, deliverables, assumptions, schedule milestones, sub-consultant needs and fee basis. Nothing <br />proceeds until the City accepts that scope. <br />STEP 2: MANPOWER PLANNING AND RESOURCE ALLOCATION: Staff are assigned based on project type <br />and urgency, and current workload is reviewed before accepting each assignment so that the proposed schedule <br />is achievable. <br />STEP 3: DATA COLLECTION AND EXISTING CONDITIONS: Survey, record research, utility coordination and <br />SUE, and geotechnical investigation are front-loaded. On a barrier island this is where the money is saved: the <br />majority of change orders on coastal roadway and drainage projects trace back to utility and groundwater <br />conditions that were not established before design. <br />STEP 4: DESIGN AND MILESTONE REVIEWS: Design proceeds to the 30, 60, 90 and 100 percent submittals <br />or as required by City, with a City review at each and an updated opinion of probable construction cost at each. <br />STEP 5: PERMITTING: Pre-application coordination with each reviewing agency precedes formal submittal. <br />Comment response logs document how every City and agency comment was resolved. <br />STEP 6: BID PHASE: Bid documents, pre-bid conference attendance and minutes, addenda through the City’s <br />Purchasing Administrator, bid evaluation and award recommendation. <br />STEP 7: CONSTRUCTION PHASE: Preconstruction meeting, submittal review, RFI response, field observation <br />and inspection, progress meetings, pay application review, change order analysis, testing coordination, punch <br />list, as-built CADD and closeout documentation.