4. APPROACH/METHODOLOGY <br />61SRS Engineering, Inc.• RFQ No. 26-07-01 <br />4. APPROACH/METHODOLOGY _______________ <br />ABILITY TO MEET DESIRED TIMELINES AND DEADLINES — SCHEDULING <br />Maintaining project schedules begins with comprehensive planning and a clear <br />understanding of all phases of work. For each assignment our Project Manager <br />prepares a project management control schedule in Gantt chart format using <br />Microsoft Project, incorporating all work elements defined in the work order <br />and including allowances for City review. Milestones typically include data <br />collection, field review, concept review, the 30/60/90/100 percent design <br />submittals, permit submittals, bid documents, construction phase support and <br />closeout. Once work begins, the Project Manager monitors the schedule and <br />adjusts as circumstances dictate, tracking critical-path items such as survey, <br />geotechnical data, utility coordination, permit review cycles, City review <br />comments and sub-consultant deliverables. Actual progress against milestone <br />deadlines is the measure of performance, and schedule variances are identified <br />and discussed at regular project team meetings. <br />Our familiarity with local agencies and permitting processes — Miami-Dade <br />DTPW, RER/DERM, WASD, FDOT and SFWMD — lets us anticipate review <br />timelines and avoid delays. Early coordination with stakeholders builds <br />alignment and reduces revisions during formal submittals. Our QA/QC <br />program also plays a direct role in schedule performance: detailed design <br />reviews at each stage reduce errors, prevent rework and streamline approvals <br />and construction. <br />EXAMPLES OF SCHEDULING TECHNIQUES AND CHALLENGES SOLVED: <br /> „CITY OF HIALEAH, E 10TH–12TH AVENUE FROM E 49TH–52ND STREET: Rather than design first and <br />discover contamination during permitting, SRS ran a preliminary study to identify contaminated areas, <br />developed conceptual drainage, and obtained DERM approval before beginning full design. This removed <br />the largest schedule risk from the critical path and reduced the City’s cost (2025). <br /> „TOWN OF CUTLER BAY, CUTLER RIDGE PINES: A $2.5M ARPA-funded emergency-driven drainage <br />program with a federal funding deadline, delivered across approximately 6,295 LF and recognized by APWA <br />as Consultant of the Year in Stormwater. <br /> „TOWN OF CUTLER BAY, SAGA BAY 1.5 SOUTH: Roadway and drainage improvements completed within <br />schedule and under budget (2024). <br /> „CITY OF HIALEAH, NW 138TH STREET: A $12.45M project requiring concurrent approvals from Hialeah, <br />Hialeah Gardens, Miami-Dade County, DERM, FDOT, SFWMD, ACOE and DEP, including an ERP with cut- <br />and-fill calculations and wetland mitigation. Parallel-tracking the agency reviews rather than sequencing <br />them kept the project on schedule. <br />COST CONTROL <br />SRS employs a disciplined and transparent approach to managing project budgets. After the City and SRS agree <br />on the scope of work, we prepare a fee proposal and present it for review. Once scope and fee are reviewed <br />together, we adjust effort up or down in specific areas until a mutually agreeable scope and fee are reached. Our <br />proposals are written to cover the entire scope, which minimizes additional services and surprises. <br />Construction cost estimating. Opinions of probable construction cost are prepared on the basis of industry- <br />recognized publications, historical price lists and current comparable South Florida construction cost data, and <br />are updated at each design milestone — concept, 30, 60, 90 and 100 percent. Our experience in both design and <br />construction gives us real-world insight into bid conditions, which produces reliable estimates and reduces the <br />risk of unforeseen expense. <br />We have completed several similar <br />professional services contracts with the <br />same proposed project managers and <br />engineers; furthermore, we are familiar <br />with contract requirements, we have <br />the necessary resources, and have good <br />working relationships with the regulatory <br />agencies. <br />“