My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
THE ENGINEERING COMPANY Bid Document (24)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
THE ENGINEERING COMPANY
>
THE ENGINEERING COMPANY Bid Document (24)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 3:21:24 PM
Creation date
8/31/2026 3:20:25 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jaime Agudelo, EI <br />Senior Construction Engineer — Stormwater / NPDES & QA Lead <br />USACE CQM-C — FDEP Qualified Stormwater Management Inspector <br />EDUCATION: BS Civil Engineering, Florida Atlantic University (2007) | BS Mining & Metallurgical Engineering, National University <br />of Colombia <br />REGISTRATIONS / CERTIFICATIONS: EIT, Florida | USACE Construction Quality Management for Contractors (CQM-C) | FDEP <br />Qualified Stormwater Management Inspector | CTQP Earthwork I–II | ACI Concrete Field Technician | Drilled Shaft & Pile Driving <br />Inspector | LBR & Aggregate Base Technician | OSHA 30 <br />Jaime leads TEC's stormwater compliance and construction QA — SWPPP implementation, NPDES inspections, dewatering <br />compliance, and the Three-Phase Control quality process on active construction. He is TEC's designated erosion-control and <br />environmental-compliance inspector for coastal work. His USACE Construction Quality Management credential anchors the <br />Three-Phase Control methodology TEC applies to every CEI Work Order. <br />Relevant Experience <br />Everglades Agricultural Area (EAA) Reservoir — USACE — Construction QA / Quality Lead | 2025–Ongoing <br />Embedded QA on a $3B+ federal program: preparatory/initial/follow-up phase controls, stormwater and dewatering compliance, <br />materials conformance, and deficiency tracking to closure under USACE CQM protocols. His stormwater and dewatering <br />compliance record on the program remains deficiency-free. <br />Herbert Hoover Dike C-10 & C-12 — USACE (Belle Glade, FL) — Alternative Quality Control Manager <br />Managed contractor quality control on federal dike rehabilitation features — definable-feature phase meetings, testing <br />frequencies, and documentation packages accepted by USACE. <br />Transportation Program — Seminole Tribe of Florida — Stormwater & QA Support | 2023–2024 <br />Authored the program's erosion-control BMP manual and supported stormwater permitting and compliance across roadway, <br />drainage, and embankment-repair task orders delivered to FDOT standards and Tribal environmental requirements. <br />Municipal Stormwater & Drainage Task Orders — Miami-Dade Municipalities — Stormwater / QA Lead | 2023–Ongoing <br />SWPPP preparation and NPDES compliance inspections for municipal drainage and roadway projects; exfiltration and outfall <br />construction QA; erosion & sedimentation control acceptance. He also prepares SWPPPs and NPDES notices of intent for TEC's <br />municipal design task orders. <br />The Engineering Company, LLC | RFQ #26-07-01 — Continuing Professional A/E Consulting Services (CCNA) <br />Page 37 of 96
The URL can be used to link to this page
Your browser does not support the video tag.