My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
THE ENGINEERING COMPANY Bid Document (24)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
THE ENGINEERING COMPANY
>
THE ENGINEERING COMPANY Bid Document (24)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 3:21:24 PM
Creation date
8/31/2026 3:20:25 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 4 — APPROACH / METHODOLOGY <br />This section presents TEC's approach to project management — cost control, scheduling, and quality assurance / <br />quality control (Evaluation Criterion 3) — and the delivery methodology TEC applies to General Civil and CEI Work <br />Orders, including the firm's communication and complaint-handling protocols required by RFQ Section 5.0(4). <br />The Work-Order Lifecycle (RFQ §3.4 Phases) <br />TEC delivers continuing-services work through a disciplined, repeatable task-order process refined on 150 MDWASD <br />task orders and TEC's current municipal continuing contracts: <br />•1 — Scoping & Fee. Within 48 hours of a City request, TEC walks the site, confirms objectives with the City Project <br />Manager, and returns a written scope, level-of-effort fee (within the contract's not-to-exceed rates), deliverables <br />list, and schedule. <br />•2 — Study / Preliminary Phase. Data collection, survey and geotechnical coordination, alternatives analysis, basis- <br />of-design memoranda, and preliminary OPCC — with up to ten (10) copies of any report furnished per RFQ §3.4. <br />•3 — Design Phase. 30/60/90/100% milestone submittals in the latest version of AutoCAD; interdisciplinary QA/QC <br />and constructability review at each gate; OPCC update at each gate; permit applications prepared and negotiated <br />(DERM/RER, MDWASD, FDEP, SFWMD, FDOT D6, City Building). <br />•4 — Bidding Assistance. Bid documents and technical specifications, pre-bid conference support, addenda, bid <br />tabulation and responsiveness review, and a written award recommendation. <br />•5 — Construction / CEI & Closeout. Contract administration, RPR inspection, materials testing verification, pay- <br />application and schedule review, substantial/final inspections, as-built verification, and a complete closeout <br />record — the City's defense file for the life of the asset. <br />Cost Control <br />Estimates that hold. TEC builds quantity-based opinions of probable construction cost with current South Florida unit <br />pricing and documented basis-of-estimate notes — prepared by a dedicated estimator (Zane Hoppes) and reconciled <br />at the 30/60/90/100% gates so scope growth is caught on paper, never in the field. During construction, TEC <br />independently verifies pay-application quantities, maintains a change-order log with independent cost checks, and <br />manages contingency drawdown transparently. <br />Track record. Since the firm's inception, every TEC project has been delivered on or under budget. The City can <br />verify this directly with the references listed in Section 5 and with the client contacts identified on each Project <br />Description Form. <br />Value engineering. On the Seminole Tribe of Florida roundabout program, TEC's redesign and re-packaging saved <br />$58,000 and increased contractor bid participation from 50% to 75% — the practical measure of documents that are <br />both economical and biddable. <br />Scheduling <br />TEC develops and maintains critical-path (Primavera P6) schedules for design and construction phases, ties every task <br />order to milestone dates agreed with the City at NTP, and manages contractor schedules through monthly CPM <br />reviews and two-week look-aheads. Slippage triggers a written recovery plan — resequencing, added crews, or scope <br />adjustment — presented to the City with cost/schedule trade-offs before float is consumed. TEC establishes realistic, <br />mutually agreed durations at every Notice to Proceed and manages to them daily — the discipline that protects both <br />parties under the contract's liquidated-damages provision (Addendum No. 8). Because TEC's office is minutes away, <br />schedule risk is confronted at the site, the day it appears. <br />The Engineering Company, LLC | RFQ #26-07-01 — Continuing Professional A/E Consulting Services (CCNA) <br />Page 43 of 96
The URL can be used to link to this page
Your browser does not support the video tag.