|
Page 108CITY OF SUNNY ISLES BEACH • RFQ #26-07-01 • CONTINUING PROFESSIONAL
<br />ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA)
<br />FDOT D4, I-595 Reconstruction, Broward County, FL | Roadway Lead Engineer - In charge of leading the design team for all structural components in a $1.3 Billion Public-Private Partnership project (the largest project in the nation at the time), including design modifications to 9 interchanges, adding three reversible express lanes from I-75 to E of SR 7, 60 roadway bridges, more than 100 lane miles. This effort included coordinating a large roadway design team with several consultants and other disciplines and agencies involved in the project and coordinating the approval of the proposed design with FDOT D4.
<br />Miami-Dade Expressway Authority (MDX), General Engineering Consultant Services, Miami, FL | Chief Engineer - Responsible for the consultant management for several MDX projects. Specific areas of technical responsibility included transportation planning, design and construction support for five limited-access highway facilities, more than 120 structures, and many toll plazas and support buildings. Responsibilities included recommending procurement types; preparing procurement documents issued by MDX; reviewing submitted responses to solicitations; and managing and coordinating all final design consultants working for the authority and procurement of all necessary environmental permits.
<br />Miami-Dade Expressway Authority (MDX), SR 836 Toll Plazas, Miami, FL | Project Manager - Responsible for 2.4 miles of design and post-design services for the roadway reconstruction along SR 836 from NW 87th Avenue to NW 107th Avenue with two toll plazas, including a new drainage system, ramps, lighting and toll plaza buildings.
<br />Miami-Dade Expressway Authority (MDX), SR 836 Flyover, Miami, FL | Project Manager - Responsible for 1.6 miles of post-design services that included a flyover ramp, three new bridges and one bridge widening, a completely new drainage system, new lighting system and signage, and pavement markings.
<br />Miami-Dade County, SR 826/Palmetto Expressway Project from SR 924/I-75 Interchange to the west of NW 17 Avenue, Miami, FL | Owner’s Representative - Responsible for coordinating the design among the 6 different consultants. The services included providing General Engineering Consultant services as needed to support the Department in managing and submitting this project. The scope included but not limited to submittal reviews, analysis of design issues, coordination with the District Design Engineer, Public Presentations, etc. This project includes the reconstruction of SR 826 to provide three general-purpose lanes, auxiliary lanes and express lanes in each direction from I-75 to I-95. Additionally, it will improve sidewalks and bicycle lanes along the frontage roads, and install a new ITS, lighting and drainage systems.
<br />Florida’s Turnpike Enterprise (FTE), SR 821 Homestead Extension of Florida’s Turnpike (HEFT) Widening, Miami, FL | Post Design Project Manager - Responsible for modifications and upgrades during construction. This project included the addition of two lanes in each direction along the mainline for the widening of approximately 2.5 miles of the Turnpike, express lanes, and improvements to local roads from SW 216th Street to Eureka Drive (SW 184th Street).
<br />Florida’s Turnpike Enterprise FTE, Campbell Drive Interchange, Miami-Dade County, FL | Project Manager - Responsible for the design, plan preparation, permitting and quality control of modifications to the existing interchange. The 1.1-mile project included two additional ramps, two new bridges, a county road improvement, new signals, landscape, two new toll plazas and two new outfalls at the C-103 canal.
<br />FDOT D6, SR 826 (Palmetto) and SW 8th Street Interchange, Miami-Dade County, FL | Project Manager - Responsible for design, plan preparation, permitting and quality control of modifications to an existing interchange. The project included modifications to all existing ramps and 1.1 miles of SW 8th Street improvements. Newly designed infrastructure included two bridges, signals, a drainage system and three outfalls at the C-4 canal.
<br />Brightline At-Grade Railroad Crossings | Roadway Lead - Responsible for modifications to all the intersecting roads with the FEC railroad tracks in Palm Beach County, Martin County and St. Lucie County. The scope included roadway, signing and pavement marking and construction layout plans for 74 railroad crossings.
<br />Florida’s Turnpike Enterprise FTE, Southern Boulevard Interchange, West Palm Beach, FL | Project Manager - Responsible for the 1.1-mile design and post-design phase. Performed plan preparation, permitting and quality control for this new interchange in Palm Beach County. New design included an interchange with on- and off-ramps, signals, water main extensions, lift stations, two bridges and a sanitary sewer force main. Additional work on existing infrastructure included county road improvements and C-51 canal modifications.
<br />City of Hialeah, Roadway Improvement Program Complete Projects, Hialeah, FL | Project Manager - These task-work order-based projects involve helping the city design and prepare documents that outline the complete reconstruction of roadways and drainage systems for multiple streets. Additionally, the projects include improving lighting, signage, and pavement markings within the project limits. Reconstruction involved changing the existing flush shoulder condition to a curb and gutter section, which required raising and lowering the streets to ensure proper drainage. Parallel parking was added, and the latest ADA standards constructed sidewalks and ramps.
<br />GORKY CHARPENTIER, PE, CGC
<br />DESIGN MANAGER
|