|
Page 141CITY OF SUNNY ISLES BEACH • RFQ #26-07-01 • CONTINUING PROFESSIONAL
<br />ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA)
<br />
<br />Phani Allu, P.E., PTOE Page | 1
<br />
<br />Years of Experience
<br />25
<br />Areas of Expertise
<br />Traffic Operations/Safety Access
<br />Management
<br />Signal Timing
<br />Lighting Analysis
<br />Signing and Pavement Marking
<br />Education
<br />M.S. in Civil Engineering, University
<br />of Connecticut, 2001
<br />B. Tech, Civil Engineering, Indian
<br />Institute of Technology, 1999
<br />Professional Registrations
<br />Florida P.E. # 68069, 2008
<br />PTOE
<br />RSP2I
<br />
<br />
<br />
<br />
<br />
<br /> Senior Engineer I
<br />
<br />
<br />
<br />Mr. Allu has 25 years of experience in traffic operations analysis, traffic safety
<br />analysis, access management studies, pedestrian/bicycle safety studies, signal
<br />timing, traffic calming, and all aspects of traffic data collection. He is proficient in the
<br />use of a variety of traffic engineering software applications including HCS,
<br />SYNCHRO, and SIDRA; and familiar with VISSIM. Mr. Allu is intimately familiar with
<br />National and Local Agency publications such as MUTCD, Highway Safety Manual
<br />(HSM), FHWA Signal Timing Manual, the FDOT Traffic Engineering Manual and
<br />MUTS, HSIP Guidelines, the FDOT LOS Handbook, Project Traffic Forecasting
<br />Handbook, Interchange Handbook, and Manual on Intersection Control Evaluation.
<br />He has conducted numerous traffic operations and safety studies as the lead
<br />engineer for the FDOT and has a thorough understanding of the various stages of
<br />the traffic/safety studies from conception of studies to development of recommended
<br />improvements and their implementation whether they are relatively simple
<br />signing/pavement marking improvements or relatively large projects that have been
<br />programmed into the FDOT work program. In addition, as Project Manager on a
<br />FDOT engineering studies and reviews contract, Mr. Allu led the review efforts for
<br />several traffic engineering studies, PD&E studies, Preliminary Engineering Reports
<br />(PER), and various Strategic Miami Area Rapid Transit (SMART) Plan studies.
<br />Project Experience
<br />Countywide Intersection Improvements Prioritization Study, Broward County.
<br />Project Manager for this ongoing contract to develop a prioritized program of
<br />approximately 30 intersection improvement projects through a structured long-listing
<br />and short-listing process applied to more than 1,400 signalized intersections
<br />countywide. The prioritization methodology leveraged readily available safety,
<br />mobility, multimodal, and socioeconomic data to evaluate and rank candidate
<br />locations. Typical recommended improvements include intersection operational
<br />enhancements, addition of turn lanes, milling and resurfacing, signing and
<br />pavement marking upgrades, drainage improvements, lighting upgrades, and traffic
<br />signal modifications. (Contact: Manuel Fontan, P.E., PTOE, 954-577-4654,
<br />Start/End Date: 02/2022-Present)
<br />Districtwide Traffic Operations Safety Studies, FDOT District 6. Project
<br />Manager and Lead Traffic Engineer responsible for traffic operational/safety studies
<br />and safety reviews that included crash analyses, intersection/corridor operational
<br />analyses, and field reviews to identify site-specific issues related to high crash study
<br />locations. Developed reports with recommendations to reduce the crash potential
<br />at the study locations. Studies included Key West Crosswalks Evaluation, Alton Rd
<br />between NW 44 St and NW 47 St; ped studies on SR 9 and SR 944; CO identified
<br />ped priority corridor studies along NW 27 Ave and NW 103 St. Also, worked with
<br />the FDOT on network screening using the Highway Safety Manual (HSM)
<br />methodology for identification of top locations for each emphasis area in the Florida
<br />Strategic Highway Safety Plan (SHSP). Conducted preliminary safety studies for
<br />several intersections identified under the Safe Strides 2 Zero program. (Contact:
<br />Misleidys Leon, P.E.; Telephone: 954-470-5335; Start/End Date: 08/2017-08/2022).
<br />Districtwide Traffic Operations Safety Reviews and Studies, FDOT District 4.
<br />Project Manager and Lead Traffic Engineer responsible for traffic operational/safety
<br />Phani Allu, P.E., PTOE, RSP2I
<br />
|