Laserfiche WebLink
Page 156CITY OF SUNNY ISLES BEACH • RFQ #26-07-01 • CONTINUING PROFESSIONAL <br />ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) <br /> <br />Steve Hughes, P.E. Page | 2 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SR-80 Lighting (FPID 441756-1; Contract CAG47), FDOT District 4. Senior Utility Coordinator and Survey/SUE Oversight. Project <br />included 18 miles of continuous lighting along SR-80 from SR-15 to CR-880. CTS’ role included survey, designates/test holes <br />throughout the corridor limits, and utility coordination. Primary responsibilities included utility coordination and clearance of conflicts <br />with ten utility agencies. (FDOT Contact: Omid Fallahinejad, PE; Telephone: 954-777-4558; Start/End Date: 2021-2023). <br /> <br />Districtwide Safety Pushbutton Projects (FPID 431635-2; Contract C9H46), FDOT District 6. Project Manager and Engineer of <br />Record. Contract includes push button design projects originating from Traffic Operation Studies, Requests, and Fatal Crash Report <br />Analysis. Includes research, analysis, and vetting safety/fatal crash reports and recommendation, then completing design projects <br />within a 6- month timeframe. Typical projects include pedestrian and multimodal improvements (including ADA upgrades), signing <br />and pavement markings, signalization, lighting, intersection improvements, drop-off and above ground fixed object shielding, <br />drainage improvements, and general roadway and operational improvements. Contract requires close coordination with the FDOT <br />Design, Traffic Operations, and Construction. CTS handled utility coordination and utility work schedules for all task work orders. <br />External coordination included all utility owners and Miami-Dade County Traffic & Signals and Miami-Dade Transit. (FDOT Contact: <br />Ramon Sierra, PE; Telephone: 305-470- 5336; Start/End Date: 2014-Present). <br />Golden Glades Truck Travel Center (GGTTC) (FPID 445984-1; Contract CAE44), FDOT District 6. Project Manager. Project <br />encompasses the design and construction of a commercial truck parking facility within the Golden Glades Interchange. This facility <br />will accommodate a minimum of 135 truck parking spaces on a 15 acres site and will also include lighting, drainage system, <br />restrooms, water/sewer improvements, landscaping, and security features. Additional amenities may include vehicle and truck <br />fueling stations, travel center with retail space and quick service restaurants, truck repair facility, truck wash, certified static scale, <br />and Truck Parking Availability System (TPAS). Primary responsibilities include Design-Build Request for Proposal Development, <br />Conceptual Plans (including site development and modeling), Utility Coordination, Scheduling, Estimates, and technical support for <br />a Joint Use Lease Agreement. (FDOT Contact: Carlos Castro; Telephone: 954-777-4499; Start/End Date: 2020-Present). <br />US-27 Safety Projects (FPID 439939-1, 439940-1, 440143-1, 440143-2; Contract CA180), FDOT District 4. Project Manager and <br />Engineer of Record. Project includes safety improvements along US-27 in Broward County from just N of I-75 to the Broward/Palm <br />Beach County line. Improvements include shoulder widening, auxiliary lanes, internally illuminated RPM’s, ITS enhancements, and <br />other signing and pavement marking enhancements. The project also included SFWMD and USACE permitting, wetland mitigation, <br />utility coordination, and drainage modifications. (FDOT Contact: Adham Naiem, PE; Telephone: 954-777-4440; Start/End Date: <br />2018-Present). <br />SR-932/NW 103rd Street RRR and Safety (FPIDs 434768-3/4; Contract CA323), FDOT District 6. Project Manager and Engineer <br />of Record. Project includes milling and resurfacing, minor widening, and signalization/signing improvements to enhance traffic <br />maneuvers. Project also includes ADA upgrades (including curb ramps, sidewalk, and bus stop locations), enhanced signing & <br />pavement markings, utility coordination, and drainage improvements. Primary responsibilities include management of all aspects of <br />the project. (FDOT Contact: Elsa Riverol, PE; Telephone: 305-470-5105; Start/End Date: 2019-Present). <br />NW 7th Avenue Complete Streets and RRR (FPID 430817-2; Contract C9G75), FDOT District 6. Project Manager and Engineer <br />of Record. Project includes repurposing of the outside through lanes to bike lanes with on-street parking. Project also includes <br />milling & resurfacing, raised medians, ADA upgrades (including sidewalk, curb ramps, and bus stop locations), enhanced signing & <br />pavement markings, signalization, lighting retrofits, utility coordination, and drainage improvements. Primary responsibilities include <br />management of all aspects of the project. (FDOT Contact: Raul Quintela, PE; Telephone: 305-470-5271; Start/End Date: 2014- <br />2018). <br /> <br /> <br /> <br />