<br />SR-80 Lighting (FPID 441756-1; Contract CAG47), FDOT District 4. Senior Utility Coordinator and Survey/SUE Oversight. Project
<br />included 18 miles of continuous lighting along SR-80 from SR-15 to CR-880. CTS’ role included survey, designates/test holes
<br />throughout the corridor limits, and utility coordination. Primary responsibilities included utility coordination and clearance of conflicts
<br />with ten utility agencies. (FDOT Contact: Omid Fallahinejad, PE; Telephone: 954-777-4558; Start/End Date: 2021-2023).
<br />
<br />Districtwide Safety Pushbutton Projects (FPID 431635-2; Contract C9H46), FDOT District 6. Project Manager and Engineer of
<br />Record. Contract includes push button design projects originating from Traffic Operation Studies, Requests, and Fatal Crash Report
<br />Analysis. Includes research, analysis, and vetting safety/fatal crash reports and recommendation, then completing design projects
<br />within a 6- month timeframe. Typical projects include pedestrian and multimodal improvements (including ADA upgrades), signing
<br />and pavement markings, signalization, lighting, intersection improvements, drop-off and above ground fixed object shielding,
<br />drainage improvements, and general roadway and operational improvements. Contract requires close coordination with the FDOT
<br />Design, Traffic Operations, and Construction. CTS handled utility coordination and utility work schedules for all task work orders.
<br />External coordination included all utility owners and Miami-Dade County Traffic & Signals and Miami-Dade Transit. (FDOT Contact:
<br />Ramon Sierra, PE; Telephone: 305-470- 5336; Start/End Date: 2014-Present).
<br />Golden Glades Truck Travel Center (GGTTC) (FPID 445984-1; Contract CAE44), FDOT District 6. Project Manager. Project
<br />encompasses the design and construction of a commercial truck parking facility within the Golden Glades Interchange. This facility
<br />will accommodate a minimum of 135 truck parking spaces on a 15 acres site and will also include lighting, drainage system,
<br />restrooms, water/sewer improvements, landscaping, and security features. Additional amenities may include vehicle and truck
<br />fueling stations, travel center with retail space and quick service restaurants, truck repair facility, truck wash, certified static scale,
<br />and Truck Parking Availability System (TPAS). Primary responsibilities include Design-Build Request for Proposal Development,
<br />Conceptual Plans (including site development and modeling), Utility Coordination, Scheduling, Estimates, and technical support for
<br />a Joint Use Lease Agreement. (FDOT Contact: Carlos Castro; Telephone: 954-777-4499; Start/End Date: 2020-Present).
<br />US-27 Safety Projects (FPID 439939-1, 439940-1, 440143-1, 440143-2; Contract CA180), FDOT District 4. Project Manager and
<br />Engineer of Record. Project includes safety improvements along US-27 in Broward County from just N of I-75 to the Broward/Palm
<br />Beach County line. Improvements include shoulder widening, auxiliary lanes, internally illuminated RPM’s, ITS enhancements, and
<br />other signing and pavement marking enhancements. The project also included SFWMD and USACE permitting, wetland mitigation,
<br />utility coordination, and drainage modifications. (FDOT Contact: Adham Naiem, PE; Telephone: 954-777-4440; Start/End Date:
<br />2018-Present).
<br />SR-932/NW 103rd Street RRR and Safety (FPIDs 434768-3/4; Contract CA323), FDOT District 6. Project Manager and Engineer
<br />of Record. Project includes milling and resurfacing, minor widening, and signalization/signing improvements to enhance traffic
<br />maneuvers. Project also includes ADA upgrades (including curb ramps, sidewalk, and bus stop locations), enhanced signing &
<br />pavement markings, utility coordination, and drainage improvements. Primary responsibilities include management of all aspects of
<br />the project. (FDOT Contact: Elsa Riverol, PE; Telephone: 305-470-5105; Start/End Date: 2019-Present).
<br />NW 7th Avenue Complete Streets and RRR (FPID 430817-2; Contract C9G75), FDOT District 6. Project Manager and Engineer
<br />of Record. Project includes repurposing of the outside through lanes to bike lanes with on-street parking. Project also includes
<br />milling & resurfacing, raised medians, ADA upgrades (including sidewalk, curb ramps, and bus stop locations), enhanced signing &
<br />pavement markings, signalization, lighting retrofits, utility coordination, and drainage improvements. Primary responsibilities include
<br />management of all aspects of the project. (FDOT Contact: Raul Quintela, PE; Telephone: 305-470-5271; Start/End Date: 2014-
<br />2018).