Laserfiche WebLink
Page 164CITY OF SUNNY ISLES BEACH • RFQ #26-07-01 • CONTINUING PROFESSIONAL <br />ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) <br /> <br />Pete Diaz, PSM Page | 2 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Jul 2016 - Florida Department of Transportation, Districts 6, Golden Glades Interchange – District Surveyor for Surveying <br />services managed consultants survey efforts. Tasks included: Writing Project Scope of Services, Staff-hour review, Project <br />coordination, Survey data review, approve survey submittals. <br />Aug. 2020 - Florida Department of Transportation, Districts 4, FM No. 431770-4, Design Survey of a 6-mile corridor of Dykes Rd and NW 196 Avenue – Project Surveyor. Services included Topography with a high detail Digital Terrain Model (DTM), Right of <br />Way survey, Drainage Survey, Utility Verification, Section survey and analysis. Tasks included: Project coordination, data search <br />and review (i.e., Horz./Vert. Control, Plats, R/W Maps, Deeds, Easements, Section Corner records), recovering/establishing <br />Horz./Vert. Control, GPS Mission Planning, GPS data analysis and processing, Field crew Coordination, Survey data review, <br />analysis, and processing. <br /> <br />Apr. 2020 - Florida Department of Transportation, Districts 4, Design Survey of a 0.6-mile corridor of US 1 & Sunrise Blvd. <br />– Project Surveyor for Surveying services that included Topographic with a high detail Digital Terrain Model (DTM), and Right of <br />Way survey. Tasks included: Project coordination, and review, recovering/establishing Horz./Vert. Control, Calculate Plats, R/W <br />Maps, Deeds, Easements, Section Corner review calculations, GPS Mission Planning, GPS data analysis and processing, Field <br />crew Coordination, Survey data review, analysis and processing, Mobile Lidar point clouds. <br />Sep. 2019 - Florida Department of Transportation, Districts 4, Design Survey of a 1.75-mile corridor of Pines Blvd. – Project <br />Surveyor for Surveying services that included Topographic with a high detail Digital Terrain Model (DTM), Right of Way survey, <br />Drainage Survey, Utility Verification, Section survey and analysis. Tasks included: Project coordination, data search and review <br />(i.e., Horz./Vert. Control, Plats, R/W Maps, Deeds, Easements, Section Corner records), recovering/establishing Horz./Vert. Control, <br />GPS Mission Planning, GPS data analysis and processing, Field crew Coordination, Survey data review, analysis and processing, <br />place and maintain aerial photogrammetric targets. <br /> <br />Mar. 2018 - Florida Department of Transportation, Districts 4, Design Survey of a 1-mile corridor of Old Griffin Rd. – Project <br />Surveyor for Surveying services that included Topographic, and Right of Way survey. Tasks included: Project coordination, and <br />review, recovering/establishing Horz./Vert. Control, Calculate Plats, R/W Maps, Deeds, Easements, Section Corner review <br />calculations, GPS Mission Planning, GPS data analysis and processing, Field crew Coordination, Survey data review, analysis and <br />processing, Mobile Lidar point clouds. <br /> Jan. 2019 to March 2020 – FDOT District 6 CEI - Performed various CEI projects to include: Topographic, boundary, and <br />construction layout surveys for transportation and infrastructure projects, ensuring precise measurements and compliance with <br />FDOT standards, Supported CEI operations by performing field inspections, verifying contractor work against design specifications, <br />and documenting daily construction activities, Collaborated with project engineers and inspectors to resolve field discrepanc ies, <br />maintain quality control, and ensure timely project delivery. <br />May 2021 - Florida Fish and Wildlife Conservation Commission, Ocean Forest Habitat Restoration (34 Acre site), Key Largo, <br />FL – Project Surveyor for Surveying services that included Topographic and Bathymetric Survey. Tasks included: Project <br />coordination, data search and review (i.e., Horz./Vert. Control, recovering/establishing Horz./Vert. Control, GPS Mission Planning, <br />GPS data analysis, Soundings, Field crew Coordination, Survey data review, analysis and processing, place and maintain aerial <br />photogrammetric targets for drone mission. <br />Jun. 2020 - Florida Power and Light, ALTA Survey on 84 Acre site for a proposed LNG facility, Homestead, FL. – Project <br />Surveyor for Surveying services that included Topographic and Boundary Survey. Tasks included: Tasks included: Project <br />coordination, data search and review (i.e., Horz./Vert. Control, Plats, R/W Maps, Deeds, Easements, Section Corner records), Title <br />review, GPS Mission Planning, GPS data analysis and processing, Field crew Coordination, Survey data review, analysis, and <br />processing. <br />Oct. 2019 - Miami Dade Water and Sewer Department (WASD) Force Main Replacement, Sterling Drive and SW 97th Court – Project Surveyor for Surveying services that included Topographic and Right of Way survey. Tasks included: Project coordination, <br />data search and review, recovering/establishing Horz./Vert. Control, Calculate Plats, R/W Maps, Deeds, Easements, Section Corner <br />review calculations. <br /> <br /> <br />