|
Page 166CITY OF SUNNY ISLES BEACH • RFQ #26-07-01 • CONTINUING PROFESSIONAL
<br />ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA)Paul E. Doll, PSM Page | 2
<br />required equipment, tools, and survey crews to perform horizontal and vertical control, alignment and existing right of way li nes,
<br />fixed wing targets, cross section every 500 ft. utility designates and test holes. (Contact: Roberto Chavez; Telephone: 954-777-
<br />4543; Start/End Date: 11/2021-10/2023).
<br />FM 449819-1 Design Survey for Full Design SR-25/US-27 from North of SR-818/Griffin Rd. to North of Sawgrass Recreation
<br />Park. 8.25 Miles. FDOT District 4. Project Surveyor. Engineering Design and Topographic Survey. The scope of work included
<br />providing the required equipment, tools, and survey crews to perform horizontal and vertical control, alignment and existing right
<br />of way lines, Mobile LiDAR targets, and utility designates. Alvaro performed was responsible for the 3D data extraction and
<br />modeling. Colored enhanced point clouds were created using the 360° images produced by the Leica TRK 700, said images were
<br />also obscured for people faces and car tags. (Contact: Evan Bain, PSM; Telephone: 954 -777-4560; Start/End Date: 1/2024-
<br />Present).
<br />FM 443980-1-52-01 SR 932/NW 103 St from NW 80 Ct to NW 77 Ave. Miami-Dade County, FL, District 6. Project Surveyor
<br />for Design Survey of SR 932/NW 103 St from NW 80 Ct to NW 77 Ave. The scope of this project included Horizontal and Vertical
<br />Control, Mobile Lidar mission planning, mobilization, mission, and processing, Topography/DTM to locate all ground features using
<br />Mobile Lidar from RW-to-RW line and 15 ft beyond where accessible, Cross-sections, Drainage survey, and 12 Mast Arm
<br />miscellaneous surveys. (FDOT Contact: Zurelys Perez de Alejo, PSM; Telephone: 305-640-7471; Start/End Date: 05/2022-
<br />7/2023).
<br />FM 447665-1 Design Survey for RRR project SR-804/Boynton Beach from SR 7 to Lyons Road. FDOT District 4. Design
<br />Survey. The scope of work included to provide the required equipment, tools, and survey crews to perform horizontal and vertical
<br />control, alignment and existing right of way lines, terrestrial mobile lidar targets, topography/DTM for 1000 ft. west of the project
<br />and obscure areas, and cross sections. (Contact: Roberto Chavez; Telephone: 954-777-4543; Start/End Date: 01/2022-02/2023).
<br />FM 447657-1 Design Survey and SUE for RRR project SR-794/Yamato Road from E of SR-9/I-95 to SR-5/US-1. FDOT
<br />District 4. Full Design Survey. The scope of work included to provide the required equipment, tools, SUE and survey crews to
<br />perform horizontal and vertical control, alignment and existing right of way lines, terrestrial mobile lidar targets, topography/DTM
<br />for obscure areas and ground shoots 5 ft. beyond right of way, cross sections, drainage survey and utility designates (Quality Level
<br />B) for 19 utility lines at 8 mast arm locations and 8 proposed light pole locations. (Contact: Roberto Chavez; Telephone: 954-777-
<br />4543; Start/End Date: 01/2022-04/2023).
<br />SR-7 RRR (FPID 432349-1), FDOT District 4. Survey Project Manager, FDOT District 4 Survey Department. The project included
<br />the RRR of SR-7 from just north of Clint Moore Road to Atlantic Avenue in Palm Beach County, FL (2.4 miles). The survey work
<br />was performed by FDOT survey crews under my direction. (FDOT Contact: Jeff Smith PSM; Telephone: 954- 777-4560. Start/End
<br />Date: 06/2015-05/2016).
<br />SR-A1A Washout Reconstruction (FPIDs 433688-4 & 433688-6), FDOT District 4. Survey Project Manager, FDOT District 4
<br />Survey Department. This project permanently repaired a storm damaged section of SR A1A from Sunrise Blvd. to NE 18th Street
<br />in the City of Fort Lauderdale, FL. The survey work was performed by FDOT survey crews under my direction. (FDOT Contact:
<br />Jeff Smith PSM; Telephone: 954-777-4560. Start/End Date: 12/2013-06/2013).
<br />SR 804 Boynton Beach Blvd, (FPID 432344-1), FDOT District 4. Survey Project Manager, FDOT District 4 Survey Department.
<br />The project included the RRR of SR-804 from West of Jog Rd to Congress Ave in Palm Beach County, FL. The survey work was
<br />performed by FDOT survey crews under my direction. (FDOT Contact: Jeff Smith PSM; Telephone: 954- 777-4560. Start/End
<br />Date: 07/2016-05/2017).
<br />I-595 3P Project (The first 3P Project in District 4), FDOT District 4. Survey Project Manager, FDOT District 4 Survey
<br />Department. From I-75 to I-95, the survey work was performed by several FDOT survey crews under my direction. This project
<br />included new lane miles, new bridges, and off-site drainage ponds. (FDOT Contact: Jeff Smith PSM; Telephone: 954- 777-4560.
<br />Start/End Date: 04/2006-06/2007).
<br />I-75 3P Project, FDOT District 4. Survey Project Manager, FDOT District 4 Survey Department. From South of Broward/Miami-
<br />Dade County line to I-595, the survey work was performed by several FDOT survey crews and consultant survey managers under
<br />my direction. This project included new lane miles and new bridges. (FDOT Contact: Jeff Smith PSM; Telephone: 954-777-4560.
<br />Start/End Date: 03/2016-06/2017).
|