My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
The Corradino Group, Inc. Bid Document (15)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
The Corradino Group, Inc
>
The Corradino Group, Inc. Bid Document (15)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 3:25:55 PM
Creation date
8/31/2026 3:22:58 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 35CITY OF SUNNY ISLES BEACH • RFQ #26-07-01 • CONTINUING PROFESSIONAL <br />ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) <br />TAB 2 | QUALIFICATIONS <br />ENGINEERS · PLANNERS · PROGRAM MANAGERS <br />TRANSPORTATION MASTER PLANAs the transportation planning and general engineering consultant, Corradino developed the city’s first transportation master plan, reviewed developments and traffic impact analysis, created one of the most successful municipal circulator systems, and provided in-house staff to assist in day-to-day planning and engineering functions, including general traffic engineering services. Corradino performed traffic counts, field observations, roadway capacity/level-of-service (LOS) analyses, traffic surveys, road safety analyses, parking and site plan studies/reviews, review of traffic impact analyses of proposed land developments, and more. <br />TRANSIT MOBILITY PLANAs a newly incorporated municipality, Doral wanted to create a multimodal transportation infrastructure to enhance its existing network of roadways, involving pedestrian, bicycle, vehicular, freight, and mass transit elements. Through the development and adoption of a Transportation Master Plan, Doral attained funding from the People’s Transportation Plan, which has been instrumental in implementing its Trolley Circulator system, a project which Corradino also assisted the city in developing. This Master Plan focused on an intensive public involvement process that would build consensus on projects developed in roadway capacity, alternative modes, and transportation demand management. Corradino developed 27 projects in these areas and implemented a 5-year Capital Improvements Plan. <br />CLIENT NAMECLIENT NAMECity of Doral <br />ADDRESSADDRESS8401 NW 53rd Terrace Doral, FL 33166 <br />CONTACT PERSONCONTACT PERSONRita Carbonell Assistant Public Works Director <br />PHONE NUMBERPHONE NUMBER 305.593.6740 Ext. 6015 <br />EMAIL EMAIL rita.carbonell@cityofdoral.com <br />PROJECT START DATEPROJECT START DATE 2005 <br />PROJECT COMPLETION DATEPROJECT COMPLETION DATE Ongoing <br />CONTRACT TYPE CONTRACT TYPE GPC/ <br />GEC On-Call Services <br />PROJECT COST PROJECT COST Work-Order Based <br />SCOPE OF SERVICESCOPE OF SERVICETransportation | Planning and General Engineering <br />TRANSPORTATION PLANNING & GENERAL ENGINEERING <br />CITY OF DORAL
The URL can be used to link to this page
Your browser does not support the video tag.