My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
The Corradino Group, Inc. Bid Document (15)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
The Corradino Group, Inc
>
The Corradino Group, Inc. Bid Document (15)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 3:25:55 PM
Creation date
8/31/2026 3:22:58 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 48CITY OF SUNNY ISLES BEACH • RFQ #26-07-01 • CONTINUING PROFESSIONAL <br />ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) <br />TAB 2 | QUALIFICATIONS <br />ENGINEERS · PLANNERS · PROGRAM MANAGERS <br />The Town of Surfside retained Corradino to complete an update to the Townwide Traffic and Pedestrian Safety Study previously prepared in 2012. The focus of the Townwide Traffic Study was to evaluate the traffic operations along key roadway corridors, evaluate the condition of existing traffic calming, recommend potential new traffic calming, confirm vehicle operating speeds along specific key roadway corridors, and complete an updated crash review of the key segments and intersections within the Town of Surfside. Some existing traffic issues included cut thru traffic and speeding in the residential neighborhood west of State Road A1A Harding Avenue. The Miami-Dade County Street Closure and Traffic Flow Modification Manual criteria were used to evaluate potential traffic calming improvements. <br />The Town of Surfside had a key strategic initiative to continue to focus on pedestrian safety and traffic mitigation on the roadway network within the Town. One key part of this priority was to improve the walkability of the Town for all users of the roadway network. A significant goal of this key strategic initiative was to implement traffic mitigation improvements to create a safer environment and community for the Town. The scope of services included extensive traffic data collection, traffic operational analysis at 30 key intersections and 14 key road segments in the Town, a 5-Year Crash Analysis, a Traffic Calming Improvement Plan, and a technical memorandum summarizing these key scope of work items. A traffic calming improvement program was developed with costs and prioritized based on the potential crash and speed reduction. <br />CLIENT NAMECLIENT NAMETown of Surfside <br />ADDRESSADDRESS9293 Harding Avenue Surfside, FL 33154 <br />CONTACT PERSONCONTACT PERSONAndre Eugent, MSCM Public Works/CIP Director <br />PHONE NUMBERPHONE NUMBER 305.299.3280 <br />EMAIL EMAIL aeugent@townofsurfsidefl.gov <br />PROJECT START DATEPROJECT START DATE 09/2022 <br />PROJECT COMPLETION DATEPROJECT COMPLETION DATE 03/2024 <br />CONTRACT TYPE CONTRACT TYPE GEC <br />PROJECT COST PROJECT COST $205,000 <br />SCOPE OF SERVICESCOPE OF SERVICETraffic and Pedestrian Safety Study <br />TOWNWIDE TRAFFIC AND PEDESTRIAN SAFETY STUDY <br />TOWN OF SURFSIDE
The URL can be used to link to this page
Your browser does not support the video tag.