My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
The Corradino Group, Inc. Bid Document (15)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
The Corradino Group, Inc
>
The Corradino Group, Inc. Bid Document (15)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 3:25:55 PM
Creation date
8/31/2026 3:22:58 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 49CITY OF SUNNY ISLES BEACH • RFQ #26-07-01 • CONTINUING PROFESSIONAL <br />ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) <br />TAB 2 | QUALIFICATIONS <br />ENGINEERS · PLANNERS · PROGRAM MANAGERS <br />Provide planning review services. Undertake traffic impact analysis as needed. Provide Presentations to Planning and Zoning Board and City Council. Provide transportation master plans, traffic calming, transit analysis, parking studies, bicycle and pedestrian analysis, complete streets, and safe routes to school analysis. <br />Corradino, through its services, wrote the Village’s Safe Routes to School Plan and grant application, which resulted in a $837,000 grant to the Village; the Village’s Transportation Master Plan; traffic calming studies for various areas of the Village; ADA Transition Plan; recently completed its Evaluation and Appraisal Report with associated Comprehensive Plan amendments, improved its traffic camera system, and provides other on-call services as needed. <br />Corradino was also hired to reevaluate the entirety of the mobility system of Key Biscayne, primarily along the Crandon Boulevard corridor which serves as Key Biscayne’s sole route off the island and the main commercial area. In the future, the area needs to function with an integrated multimodal transportation system if traffic congestion and associated travel time delays are going to be tolerable. Corradino assessed the existing system, then planned and implemented safe walking and cycling routes from major origins and destinations in the Village. These routes included safe crossings at the major vehicular corridors, as well as reclaiming some of the vehicular capacity on those corridors for alternative modes. Transit routing was reexamined, and more locally suitable transit alternative were suggested. Vehicular travel was enhanced through technological and operational improvements along the roadways. <br />CLIENT NAMECLIENT NAMEVillage of Key Biscayne <br />ADDRESSADDRESS88 West McIntyre Street, Suite 250 Key Biscayne, FL 33149 <br />CONTACT PERSONCONTACT PERSONSteven Williamson Village Manager <br />PHONE NUMBERPHONE NUMBER 305.365.5514 <br />EMAIL EMAIL manager@keybiscayne.fl.gov <br />PROJECT START DATEPROJECT START DATE 2015 <br />PROJECT COMPLETION DATEPROJECT COMPLETION DATE Ongoing <br />CONTRACT TYPE CONTRACT TYPE General Planning <br />PROJECT COST PROJECT COST Work Order Based <br />SCOPE OF SERVICESCOPE OF SERVICEGeneral Services <br />GENERAL PLANNING & TRAFFIC ENGINEERING SERVICES <br />VILLAGE OF KEY BISCAYNE
The URL can be used to link to this page
Your browser does not support the video tag.