My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
The Corradino Group, Inc. Bid Document (15)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
The Corradino Group, Inc
>
The Corradino Group, Inc. Bid Document (15)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 3:25:55 PM
Creation date
8/31/2026 3:22:58 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 51CITY OF SUNNY ISLES BEACH • RFQ #26-07-01 • CONTINUING PROFESSIONAL <br />ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) <br />TAB 2 | QUALIFICATIONS <br />ENGINEERS · PLANNERS · PROGRAM MANAGERS <br />The Miami-Dade TPO entered into contract with The Corradino Group to examine the need for additional transit improvements in the South Dade Corridor between Dadeland South and Florida City. The study will recommend an initial broad set of alternatives for the US 1/Busway Corridor. The initial set of alternatives will be analyzed and narrowed down to a smaller set of alternatives. The second tier of alternatives will be evaluated at an increased level of detail before being presented to the public. Public recommendations for a selected alternative will be forwarded to the TPO board who will select the final alternative (known as the Locally Preferred Alternative or LPA), which may be further analyzed in a more detailed phase of the study. <br />The following is a summary of the work that will be accomplished during this process: <br />Task 2.0 Public and Agency InvolvementThis task will provide an open, proactive, participatory process for the public, affected agencies and others to become partners with the Citizens Advisory Committee. <br />Task 3.0 Project InitiationThe purpose of this task is to present background information on existing conditions in the South Dade Corridor and to provide input to the preparation of the Methodology Report, which will prescribe methods and assumptions to be used in the screening and detailed evaluation of alternatives. <br />Task 3.1 Methodology Report <br />Task 3.2 Prepare Purpose and Need Statement <br />Task 3.3 Criteria and Measures <br />CLIENT NAMECLIENT NAMEMiami-Dade County TPO <br />ADDRESSADDRESS111 NW 1st Street, Suite 910 Miami, FL 33128 <br />CONTACT PERSONCONTACT PERSONAileen Boucle AICP Executive Director <br />PHONE NUMBERPHONE NUMBER 305.375.4507 <br />EMAIL EMAIL TPO@mdtpo.org <br />PROJECT START DATEPROJECT START DATE 03/2005 <br />PROJECT COMPLETION DATEPROJECT COMPLETION DATE 11/2006 <br />CONTRACT TYPE CONTRACT TYPE Lump Sum <br />PROJECT COST PROJECT COST $1.56 Million <br />SCOPE OF SERVICESCOPE OF SERVICEAlternative Development Coordination w/ FTA, Station Area Planning, Public Involvement, Modeling, Fatal Flaw Analysis <br />SOUTH DADE CORRIDOR ALTERNATIVE ANALYSIS <br />MIAMI-DADE COUNTY TPO <br />RED = REGIONAL HUBBLUE = COMMUNITY HUBGREEN = FUTURE HUB
The URL can be used to link to this page
Your browser does not support the video tag.